MPERC · Madhya Pradesh Electricity Regulatory Commission
Forum and Electricity Ombudsman for Redressal of Consumer Grievances (Revision-II) (Second Amendment) Regulations, 2021 — ARG-3 (II) (ii) of 2026
Madhya Pradesh Electricity Regulatory Commission (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) (Revision-II) (Second Amendment) Regulations, 2021 {ARG-3 (II) (ii) of 2026}
AmendmentDated 31 Jul 2026Published in the Gazette 31 Jul 2026No. 1249/MPERC/2026 dated 31.07.2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page Gazette-notified instrument by which MPERC makes the second amendment to its 2021 Regulations establishing the consumer grievance-redressal Forum and the Electricity Ombudsman (p1). Its only operative change substitutes Regulation 4.5 of Chapter 4 of the Principal Regulations, so that the Electricity Ombudsman is paid a fixed fee or honorarium plus other benefits as approved by the Commission — the regulation itself fixes no amount, leaving that to a later Commission decision (p1).
The amendment is made under s.181(2)(r), (s) and (zp) read with s.42(5)–(7) of the Electricity Act 2003; it extends to Madhya Pradesh, applies to Distribution Licensees and Franchisees in their respective licensed areas, and comes into force on Gazette notification, printed as 31.07.2026 (p1). Analysts should note the short title still carries the year 2021 while the instrument is numbered ARG-3(II)(ii) of 2026 (p1).
Read with this
The regulation
Amendments and corrections
Other copies of these documents (1)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.