Skip to content

OERC · Odisha Electricity Regulatory Commission

Fees and Charges of State Load Despatch Centre and Other Related Matters Regulations, 2010

Orissa Electricity Regulatory Commission (Fees and Charges of State Load Despatch Centre and other related matters) Regulations, 2010

RegulationDated 18 Sep 2010No.4940 dated 18.09.2010

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Case No. 81/2010 is the Commission's suo-motu proceeding that created a regime for what the State Load Despatch Centre may charge the users of the Odisha intra-state grid. Pages 1–4 are the order: a draft notification was published on 19.04.2010 for public comments, SLDC, OPTCL, GRIDCO and OHPC responded and were heard on 14.07.2010, and the Commission records the changes it made to the draft in a comparison table (pp2–4) before directing publication in the Orissa Gazette (p4). The order is dated 18.09.2010 (p1).

Pages 5–18 are the notification (No. 4940) and the Regulations, made under s.181(2)(g) read with s.32(3) of the Electricity Act 2003, with the recitals tracing SLDC's functions to ss.31 and 32 and to the 2005 State reform scheme that vested SLDC in OPTCL (p5). Chapter I gives the title, applies the Regulations to all users of the intra-state transmission network — expressly excluding stand-alone generators, CGPs and franchisees not connected to it — and commences them on gazette publication (p6). Chapter II supplies the vocabulary: the Fees/Charges distinction, User, Buyer and Seller, and the split of SLDC's work into System Operation and Market Operation Functions (pp6–8).

Chapter III sets the filing and review cycle: SLDC's annual revenue requirement and allocation proposal, pre-approval of capital schemes above a cost threshold, Commission scrutiny and public hearing, an approval clock, truing-up, and the rules on capital cost, additional capitalisation, debt:equity and the ring-fenced SLDC Development Fund (pp8–11). Chapter IV gives the building blocks of the annual charge — return on equity, interest on loan, depreciation, O&M, human resource expenses and working-capital interest — with the computation conventions for each (pp11–14). Chapter V splits the annual charge between system operation and market operation functions, prescribes who pays what share and on what basis, and provides for one-time registration of users (pp14–16). Chapter VI covers monthly billing, advance security, escalation of billing disputes through the Grid Coordination Committee to the Commission, late payment surcharge and rebates (pp16–17). Chapter VII adds the machinery clauses — segregation of accounts, use of information, amendment, savings, practice directions and relaxation (pp17–18). Annexure-I is the registration application format (pp19–20).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, ARR and true-up, Return, financing and working capital

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document