Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Arunachal Pradesh Electricity Supply Code, 2018 — Draft

Arunachal Pradesh Electricity Supply Code'2018

Draft regulationDated 1 Jun 2018APSERC/ NOTIFICATION/ dated 1 st June, 2018

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Arunachal Pradesh State Electricity Regulatory Commission's notification of the Arunachal Pradesh State Electricity Supply Code, 2018, issued on 1 June 2018, with objections or suggestions invited by 4 July 2018 (p1). It states that the Commission makes the Code under s.50 and s.181(2)(x) of the Electricity Act 2003, that the Code applies to all distribution and retail supply licensees, including deemed licensees, all consumers in the State, persons exempt under s.13 and unauthorised supply/use/diversion, and that it comes into force on publication in the official Gazette (p1–2). The annexed forms are minimum requirements and may be amended by licensees with the Commission's prior approval (p2).

After front matter and a table of contents (p4–9), Section 1 defines the Code's terms, including consumer classes, demand, load, metering, premises and area classifications (p10–18). Section 2 sets the system of supply: voltage classes and voltage-limit duties; supply-voltage categories by load; dedicated feeders; high/low-voltage surcharge and rebate; load balancing; power factor; safety, wiring, earth-leakage and transformer protection; motor controls and harmonics; irrigation pumps; parallel operation; franchisee distribution; and standards of performance (p19–28).

Section 3 is the connection and modification procedure. It covers the licensee's duty to supply, cost-sharing for system extension, consumer-executed works, conditions for connection, special categories such as multi-consumer complexes and high-rise buildings, application forms and documents, processing, inspection, defect rectification, demand notes, payment, release timelines, temporary supply and Tatkal Yojana, change of name and transfer, conversion, reclassification, shifting, load enhancement/reduction, annual review, grievance redressal, agreements, security deposit and general conditions of supply (p29–65).

Section 4 specifies recovery of charges for giving supply and for electricity supplied, and the annual approval of cost data after public hearing (p66–70). Section 5 governs metering, billing and payment: meter requirements and installation, reading, testing, replacement and cost allocation, new metering technologies and rooftop-solar net metering; bill contents and special billing situations; payment modes, disputed bills, late payment surcharge, instalments and recovery of arrears (p71–95).

Section 6 sets out the theft and unauthorised-use procedures: inspection, reports, show-cause notices, replies, hearings, assessment, default consequences and appeal to the Appellate Authority (p96–108). Section 7 covers temporary and permanent disconnection and reconnection (p109–112). Section 8 contains general provisions on monitoring and MIS, load shedding, service of notices, demand-side management, force-majeure exemptions, repeal and savings, and relaxation/removal of difficulties (p113–115). Section 9 lists related APSERC and central regulations (p116–117). The annexures contain application forms, connected-load and test-report formats, complaint and inspection forms, security-deposit and theft-assessment methods, a cost data book, miscellaneous charges and service timelines (p118–173).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document