Skip to content

AERC · Assam Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024 — Statement of Reasons

Statement of Reasons for the Draft AERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024

Statement of reasonsDated 5 Nov 2024No AERC 944/2024/30 dated 5.11.2024

The commission's reasons for the Multi Year Tariff Regulations, 2024 — Generation, Transmission, SLDC, Distribution Wheeling and Retail Supply.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Assam Electricity Regulatory Commission's Statement of Reasons for the draft AERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024. It explains why the Commission is moving to a new multi-year tariff framework: the next control period begins on 1 April 2025, and the Commission has lengthened the control period from three years to five years—FY 2025-26 to FY 2029-30—to give more stability to operating norms and reduce risk for consumers and utilities (p1).

Pages 1–2 set out the consultation record. The draft regulations were published in two newspapers on 22 August 2024, comments were invited by 16 September 2024, written suggestions came from APDCL, AEGCL and APGCL, a public hearing was held on 22 October 2024, and the Commission then directed that the proposed amendments be finalized and notified in the Official Gazette.

The bulk of the document, pages 3–24, is a clause-by-clause stakeholder comment and response table. It covers definitions (useful life, control period, auditor, BESS), sharing of gains, debt-equity ratio, depreciation, return on equity, interest on working capital and receivables, tariff-based competitive bidding, income from other business, capital cost and additional capitalization, tariff filing timelines, ToD tariff and hydro operating norms. Most requests from APDCL, AEGCL and APGCL were rejected with 'no change'; several drafting errors were corrected. The main substantive modification visible is the TBCB threshold for new individual intra-state transmission projects, set at Rs 250 crore, with augmentation/upgradation and already-approved projects excluded (p8). Pages 23–24 record APGCL comments on O&M and hydro norms.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Return, financing and working capital

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document