Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Sikkim Electricity Grid Code Regulations, 2025

Sikkim State Electricity Regulatory Commission (Sikkim Electricity Grid Code) Regulations, 2025

RegulationDated 14 Aug 2025Published in the Gazette 21 Aug 2025No. 08/SSERC/GC/2013-14/06 dated 14.08.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software, from pages 1 to 31 of 122. Check the regulator's original before you rely on it.

SSERC has notified a new principal grid code for Sikkim, the Sikkim Electricity Grid Code (SEGC) 2025, issued 14 August 2025 and published in the Sikkim Gazette on 21 August 2025; it comes into force from Gazette publication (p1). It supersedes the 2012 State Grid Code and says that where SEGC is silent but the IEGC covers a matter, the IEGC applies (p1). It applies to generators, transmission licensees including STU, SLDC, distribution licensees including deemed licensees/SEZs/Indian Railways, open access and EHV consumers, RE generators and solar/wind/hybrid park developers, and QCAs/aggregators/lead generators connected to or using In-STS, with a power for the Commission to relieve a transmission licensee or user from compliance (p1–2).

Chapter 1 defines the scope and a long set of grid terms (p1–17). Chapter 2 is the governance chapter: it sets up the Grid Code Review Panel, the Operation Coordination Committee and the Protection and Communication Coordination Committee, describes their membership, functions and review/amendment route to the Commission, and assigns roles to SLDC, ALDC, DCC, STU, transmission licensees, distribution licensees, users, RE generators and QCAs (p17–29). It also covers dispute resolution, precedence of the Grid Code over contracts, IEGC compatibility, compliance monitoring, penalties and third-party audit (p29–30).

Chapter 3 starts the Resource Planning/Resource Adequacy Code: integrated resource planning, demand forecasting, generation resource adequacy/procurement planning and transmission resource adequacy assessment, largely by reference to the SSERC (Framework for Resource Adequacy) Regulations, 2025 (p31).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document