SSERC · Sikkim State Electricity Regulatory Commission
Sikkim Electricity Grid Code Regulations, 2025
Sikkim State Electricity Regulatory Commission (Sikkim Electricity Grid Code) Regulations, 2025
RegulationDated 14 Aug 2025Published in the Gazette 21 Aug 2025No. 08/SSERC/GC/2013-14/06 dated 14.08.2025
Summary
Summary written by software, from pages 1 to 31 of 122. Check the regulator's original before you rely on it.
SSERC has notified a new principal grid code for Sikkim, the Sikkim Electricity Grid Code (SEGC) 2025, issued 14 August 2025 and published in the Sikkim Gazette on 21 August 2025; it comes into force from Gazette publication (p1). It supersedes the 2012 State Grid Code and says that where SEGC is silent but the IEGC covers a matter, the IEGC applies (p1). It applies to generators, transmission licensees including STU, SLDC, distribution licensees including deemed licensees/SEZs/Indian Railways, open access and EHV consumers, RE generators and solar/wind/hybrid park developers, and QCAs/aggregators/lead generators connected to or using In-STS, with a power for the Commission to relieve a transmission licensee or user from compliance (p1–2).
Chapter 1 defines the scope and a long set of grid terms (p1–17). Chapter 2 is the governance chapter: it sets up the Grid Code Review Panel, the Operation Coordination Committee and the Protection and Communication Coordination Committee, describes their membership, functions and review/amendment route to the Commission, and assigns roles to SLDC, ALDC, DCC, STU, transmission licensees, distribution licensees, users, RE generators and QCAs (p17–29). It also covers dispute resolution, precedence of the Grid Code over contracts, IEGC compatibility, compliance monitoring, penalties and third-party audit (p29–30).
Chapter 3 starts the Resource Planning/Resource Adequacy Code: integrated resource planning, demand forecasting, generation resource adequacy/procurement planning and transmission resource adequacy assessment, largely by reference to the SSERC (Framework for Resource Adequacy) Regulations, 2025 (p31).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.