Skip to content

CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Integrated Mine) for Input Price — Annexure-I (Part IV), Tariff Regulations, 2024

TARIFF FILING FORMS (INTEGRATED MINE) FOR DETERMINATION OF INPUT PRICE Main Tariff Form PART-IV

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Annexure-I/Part IV of the Central Electricity Regulatory Commission's tariff filing forms for an 'Integrated Mine' — a coal/lignite mine tied to a generating company. It is a blank form set, not a substantive tariff order: a petitioner uses it to put up the data on which the Commission will determine the input price of fuel from the mine for the 2024-29 tariff period. Pages 2–4 are navigation: a checklist of the main tariff forms (Form 1 to Form 18, p2), the list of Part IV supporting forms (Form A/B to Form N, p3), and a list of supporting documents such as incorporation and commencement certificates, audited mine and corporate accounts, loan and equity agreements, approvals, end-use plant details, cost audit reports and reconciliations, plus the e-filing/pen-drive filing requirement (p4).

Pages 5–8 carry the input-price build-up forms: Summary of Input Price (Form 1, p5); Summary of ROM Cost (Form 1A, p6), which builds annual extraction cost, annual target quantity, mining charge and fixed reserve price into ROM cost per tonne; and Summary of Additional Charges (Form 1B, pp7–8) for crushing, transportation, handling and washing charges, whether done departmentally or through agencies.

Pages 9–13 cover claimed capital cost, return on equity and O&M cost (Forms 2, 2A, 2B), mine characteristics and the approved mine plan (Form 3), and the normative parameters used for input-price computation such as base ROE, effective tax rate, working-capital input-cost days, stores and spares, one-month O&M and working-capital interest rate (Form 3A).

Pages 14–22 are financing forms: foreign loans (Form 4) and foreign equity (Form 4A), abstract of admitted capital cost, financial package up to COD and peak rated capacity (Form 6), mine-specific loans (Form 7) and allocation of corporate loans to the integrated mine (Form 8), with detailed notes on refinancing, hedging, drawl and repayment.

Pages 23–32 cover additional capitalization after COD, its financing, depreciation calculation and statement, weighted average interest on actual loans, and the draw-down schedule for IDC and financing charges, including equity/debt pari-passu and IDC-on-normative-loan conditions. Pages 33–37 cover non-tariff income (Form 15), statutory charges such as royalty, DMF, NMET, GST compensation cess and GST (Form 16), mine closure expense recovery from an escrow deposit (Form 17), and GCV adjustment data (Form 18).

Pages 38–56 are the supporting forms: abstract and break-up of capital cost for a new mine, construction/supply/service packages, de-capitalized assets, reconciliation of capitalization with books, exclusions claimed, capital cost and CWIP statements, interest on normative loan and working capital, incidental expenditure up to production/COD, package-wise expenditure, actual cash expenditure and liability flow.

Standard name
Tariff Regulations
Primary topics
Fuel price and supply, Capital cost and investment, Return, financing and working capital

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document