UPERC · Uttar Pradesh Electricity Regulatory Commission
Compliance Audit Regulations, 2012
Uttar Pradesh Electricity Regulatory Commission (Compliance Audit) Regulations, 2012
RegulationDated 7 Jan 2013No. UPERC/Secy/Regulation/2012-1502 dated January 7th, 2013
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the Commission's own rules for running compliance audits of the entities it regulates. The Commission may at any time audit a regulated entity to verify compliance with the Act, Rules, Regulations, and its own orders and directions (p5). It does this through empanelled Consultants/Auditors, or by fresh selection, or single-source selection in exceptional cases; it frames Terms of Reference before an audit begins and assigns the specific task by order (p5).
Section 4 sets who may be engaged and on what independence terms: no office or commercial interest in the audited entity for the two years before engagement, a written no-conflict declaration, and role-specific minimum qualifications — CA/ICWA/MBA (Finance) for financial tasks, LLB for legal tasks, engineering graduation for technical tasks — with a minimum 10 years' experience in the relevant field (p5–6). Remuneration is to be specified in the ToR by reference to the UPERC (Appointment of Consultants) Regulations, 2000 (p6).
Section 5 makes the Commission pay audit costs first, with the regulated entity reimbursing within a month, and lets each class of entity recover the cost through a stated route — ARR pass-through, tariff petition, trading margin with approval, or SLDC budget (p6). Section 6 sets the audit method: inspection and investigation on at least 15 days' written notice, a duty on the entity to produce books and information, evidence gathering through data requests, site visits, interviews, analysis of filings and public records, and third-party complaints, and a minimum content list for the report plus a signed professional-opinion statement (p6–7). On receiving a report the Commission may, after giving the entity a reasonable chance to represent, act by written order under the Act (p7). Sections 8–10 give the Commission powers to remove difficulties, to amend the regulations, and to issue orders and practice directions (p7).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.