Renewable Energy Purchase Obligation (Second Amendment) Regulations, 2024

JSERC (Renewable Energy Purchase Obligation) (Second Amendment) Regulations, 2024

AmendmentDated 15 Mar 2024Published in the Gazette 15 Mar 2024Notification no. 98 dated 15 th March, 2024

Amends the Renewable Energy Purchase Obligation and its Compliance Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page JSERC notification amending the Commission's 2016 Renewable Energy Purchase Obligation Regulations. It is issued under s.181(1) read with ss.61, 66 and 86(1)(e) of the Electricity Act, 2003 and states that it follows the Ministry of Power notification S.O. 4617(E) dated 20 October 2023 (p1). It extends to Jharkhand and comes into force on 1 April 2024, after gazette publication, unless reviewed earlier or extended by the Commission (p2).

The operative change is to clause 5.2 of chapter A5 of the Principal Regulations. A year-wise RPO trajectory table is substituted, giving the minimum percentage of each obligated entity's total consumption to be met from renewable sources, broken into four components — wind, hydro, distributed, and other — plus a total, for each year from 2024-25 to 2029-30 (p2).

The accompanying notes, not the table, do the substantive work. They define which projects count towards each component: wind and hydro projects commissioned after 31 March 2024, hydro including pumped storage and small hydro and free power from such projects, hydro located outside India as approved by the Central Government case by case; distributed renewable energy only from projects under 10 MW including all solar metering configurations; and 'other' from projects commissioned before 1 April 2024 (p2–3).

The final set of sub-clauses sets the compliance mechanics: interchangeability and carry-over of excess energy between the wind, hydro and other components; open access consumers and captive plants meeting the total target irrespective of the non-fossil source; meeting targets directly or through Renewable Energy Certificates under the CERC REC Regulations, 2022; shortfall treated as non-compliance with penalty under s.26(3); and JREDA maintaining compliance data and reporting to JSERC and the Central Government (p3).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document