WBERC · West Bengal Electricity Regulatory Commission
Rural Electrification Policy, 2006
Rural Electrification Policy
PolicyDated 23 Aug 2006Published in the Gazette 23 Aug 2006No.44/26/05-RE (Vol-II) dated 23rd August, 2006
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a Ministry of Power resolution published in the Gazette of India on 23 August 2006, notifying the Rural Electrification Policy under Sections 4 and 5 of the Electricity Act 2003 (p1). It sets national goals for rural household access to electricity by 2009 and a minimum lifeline consumption of 1 unit per household per day by 2012 (p2). It treats grid connectivity as the normal route, covering distribution up to 33/11 or 66/11 kV, but allows off-grid stand-alone systems, decentralised distributed generation and isolated lighting where grid extension is not feasible or cost-effective; a village means a census village, and remote villages using only isolated lighting are not to be designated electrified (pp3–4). State Governments must prepare and notify Rural Electrification Plans within six months, mapping delivery mechanisms and integrating with district plans (pp3–4).
The policy describes the Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) as the main rural electrification programme, with 90% capital subsidy for the rural distribution backbone, village electrification infrastructure and decentralised generation, and 100% subsidy for below-poverty-line household connections; REC is nodal agency (pp4–5). It adopts the existing definition of an electrified village from the Ministry of Power O.M. of 5 February 2004, based on Gram Panchayat certification against infrastructure, public-place supply and a household-electrification threshold, with annual certification as on 31 March (p6). It requires District Committees under section 166(5) within three months, women's representation and a Panchayati Raj advisory role (pp6–7).
Subsequent sections set financial assistance principles — one-time public assistance, least-cost options, franchisee deployment, revenue sustainability, annuity-based support for decentralised generation, NABARD/RBI model schemes, energy efficiency and IT use (pp7–9). For stand-alone systems, it defines rural areas by the Seventy-Third Amendment, requires State notification, explains the section 14 eighth-proviso licensing exemption, leaves retail tariffs to mutual agreement subject to subsidy pass-through and Commission guidelines, and provides special approvals for projects up to 1 MW using local resources (pp9–11). For bulk purchase and local distribution, it links sections 5 and 13, sets out franchisee models, selection, security, bulk purchase price and retail tariff treatment, universal service obligations, open-access surcharge exemption and continued safety standards (pp11–15). The policy is reviewable as needed (p15), and an annexure reproduces the relevant Act provisions (pp16–17).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.