Skip to content

TERC · Tripura Electricity Regulatory Commission

Terms and Conditions of Consultants Regulations, 2005 — First Amendment, 2026 — Draft

Tripura Electricity Regulatory Commission (Terms and Conditions of Consultants) Regulations, 2005 (First Amendment), 2026

Draft amendmentDated 13 Feb 2026No.F.25/TERC/2025/1549 dated 13th February, 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page amending regulation issued by the Tripura Electricity Regulatory Commission (TERC) to update the fees payable to consultants engaged by the Commission itself. It recites that the Principal Regulation — the TERC (Terms and Conditions of Consultants) Regulations, 2005 — was notified on 19 September 2006, and that cost-of-living pressures and inflationary trends make the existing remuneration structure unrealistic, so a framework reflecting present market conditions is needed (p1).

Clause 1 supplies the short title and makes the amendment come into force from the date of publication in the Tripura Gazette (p1). Clause 2 substitutes a new Regulation 3(f) in the Principal Regulation: it fixes ceilings on consolidated consultant remuneration — a monthly cap for individuals and a per-case cap for other bodies — and lets the Commission exceed them only by written order recording reasons (p1). Retired Central Government, State Government, CPSU and State Government Undertaking employees appointed as consultants are to be paid per the Tripura State Pay Matrix 2018 (p1–2).

The new clause also allows the Commission to revise fee rates by written order as situations require, provides for an annual escalation of the consolidated fee decided case by case on performance, workload and output, and requires pro-rata deduction of remuneration for absence without sanctioned leave or beyond admissible leave (p2).

Standard name
Appointment of Consultants
Primary topics
Commission staff and members

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document