Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

MP Gazette Notification dated 07-MARCH-2025

MP Gazette Notification dated 07-MARCH-2025 (English)

RegulationDated 7 Mar 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

It sets out what happens when an obligated entity fails to meet its RPO: the Commission may authorise an officer of the State Agency to procure the shortfall of Renewable Energy Certificates from a Power Exchange, and may direct the nodal agency for short-term open access to regulate the obligated entity's intra-State short-term open access for non-green energy, in line with the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (p6). The next clause makes failure to purchase the required percentage of renewable power or certificates a matter for penalty under section 142 of the Act, while allowing an entity facing genuine difficulty due to non-availability of renewable power or certificates to approach the Commission to carry the compliance requirement forward (p6).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document