MPERC · Madhya Pradesh Electricity Regulatory Commission
MP Gazette Notification dated 07-MARCH-2025
MP Gazette Notification dated 07-MARCH-2025 (English)
RegulationDated 7 Mar 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
It sets out what happens when an obligated entity fails to meet its RPO: the Commission may authorise an officer of the State Agency to procure the shortfall of Renewable Energy Certificates from a Power Exchange, and may direct the nodal agency for short-term open access to regulate the obligated entity's intra-State short-term open access for non-green energy, in line with the Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2021 (p6). The next clause makes failure to purchase the required percentage of renewable power or certificates a matter for penalty under section 142 of the Act, while allowing an entity facing genuine difficulty due to non-availability of renewable power or certificates to approach the Commission to carry the compliance requirement forward (p6).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.