Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2024

Jharkhand State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024

RegulationDated 23 Oct 2024Published in the Gazette 5 Nov 2024In force from 1 Apr 2025Notification No. 105 dated 23th October, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is JSERC's principal resource adequacy regulation for Jharkhand, issued 23 October 2024 and gazetted 5 November 2024, to commence on 1 April 2025 after Gazette publication (p1–2). It applies to generating companies, distribution licensees, SLDC, STU and other grid-connected entities in the State (p2). Chapter 1 sets title, extent, objective, applicability and definitions (p2–4). Chapter 2 establishes the RA framework and its four steps — demand assessment/forecasting, generation resource planning, procurement planning, monitoring and compliance — and requires DISCOMs to prepare MT-DRAP and ST-DRAP (p5). Chapter 3 governs demand assessment: DISCOM responsibility, consumer-category load forecasts, permitted forecasting methods, adjustment for DSM/open access/EVs/tariff/policies, loss trajectories, peak demand derivation, scenario analysis, short-term hourly forecasts and aggregation by SLDC/STU (p5–8). Chapter 4 covers generation resource planning: resource mapping, capacity crediting methodology, planning reserve margin, resource gap analysis, national/state RA plans, allocation of state peak shares, contract-tenure mix, exclusion of Day-Ahead Market procurement and annual approval of MT/ST-DRAP (p8–13). Chapter 5 sets procurement planning: least-cost optimal mix, RE/RPO-compliant procurement, storage contracting, DEEP/PUSHP/OTC routes, capacity sharing, prior Commission approval of PPAs/PSAs and emergency variations (p13–16). Chapter 6 provides monitoring and compliance, with non-compliance charges levied by SLDC, waived at this stage but applicable from 1 April 2026 and not recoverable through ARR (p16–17). Chapter 7 assigns roles, data sharing, annual timelines, publication duties and planning cells (p17–19). Chapter 8 contains miscellaneous powers, and Annexure-I supplies data templates (p19–24).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document