Framework for Resource Adequacy Regulations, 2024
Jharkhand State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
RegulationDated 23 Oct 2024Published in the Gazette 5 Nov 2024In force from 1 Apr 2025Notification No. 105 dated 23th October, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is JSERC's principal resource adequacy regulation for Jharkhand, issued 23 October 2024 and gazetted 5 November 2024, to commence on 1 April 2025 after Gazette publication (p1–2). It applies to generating companies, distribution licensees, SLDC, STU and other grid-connected entities in the State (p2). Chapter 1 sets title, extent, objective, applicability and definitions (p2–4). Chapter 2 establishes the RA framework and its four steps — demand assessment/forecasting, generation resource planning, procurement planning, monitoring and compliance — and requires DISCOMs to prepare MT-DRAP and ST-DRAP (p5). Chapter 3 governs demand assessment: DISCOM responsibility, consumer-category load forecasts, permitted forecasting methods, adjustment for DSM/open access/EVs/tariff/policies, loss trajectories, peak demand derivation, scenario analysis, short-term hourly forecasts and aggregation by SLDC/STU (p5–8). Chapter 4 covers generation resource planning: resource mapping, capacity crediting methodology, planning reserve margin, resource gap analysis, national/state RA plans, allocation of state peak shares, contract-tenure mix, exclusion of Day-Ahead Market procurement and annual approval of MT/ST-DRAP (p8–13). Chapter 5 sets procurement planning: least-cost optimal mix, RE/RPO-compliant procurement, storage contracting, DEEP/PUSHP/OTC routes, capacity sharing, prior Commission approval of PPAs/PSAs and emergency variations (p13–16). Chapter 6 provides monitoring and compliance, with non-compliance charges levied by SLDC, waived at this stage but applicable from 1 April 2026 and not recoverable through ARR (p16–17). Chapter 7 assigns roles, data sharing, annual timelines, publication duties and planning cells (p17–19). Chapter 8 contains miscellaneous powers, and Annexure-I supplies data templates (p19–24).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.