Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Generation Tariff Regulations, 2025

Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2025

RegulationDated 15 Oct 2025Published in the Gazette 15 Oct 2025Notification No. 113 dated 15th October, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software, from pages 1 to 35 of 83. Check the regulator's original before you rely on it.

This is JSERC’s principal multi-year tariff regulation for generating stations in Jharkhand. It was notified in the Jharkhand Gazette on 15 October 2025 and replaces the Commission’s earlier generation-tariff regulations, while expressly saving the old regime for matters up to FY 2025-26 (p1–3). It applies to generating stations or units whose tariff the Commission determines under Section 62 read with Section 86 of the Electricity Act, and excludes stations whose tariff is discovered through Section 63 competitive bidding and stations based on renewable energy sources (p3).

Chapter I (p2–14) sets title, commencement, scope, definitions and interpretation. It defines the control period as 1 April 2026 to 31 March 2031 and creates technical, financial and operational terms for thermal, hydro, pumped storage and gas generation. Section A4 makes the prescribed operating norms ceiling norms, so a generating company and beneficiaries may agree improved norms, and a PPA with better norms prevails (p14–15).

Chapter II (p15–22) establishes the MYT framework and guiding principles: business plan and capital investment plan, baseline from audited accounts, performance parameters, incentive and penalty sharing, truing up and annual performance review. It distinguishes controllable from uncontrollable factors and allows pass-through for force majeure and change in law (p15–20). Truing-up requires refund or recovery of surplus/gap with interest at Bank Rate plus 200 basis points, and delayed filings can lose carrying cost (p21).

Chapter III (p22–34) is the tariff-determination core: principles for existing and new stations, part-capacity and expansion, revised emission standards and multipurpose hydro; in-principle approval for major additional capex; detailed capital cost rules including new, existing and hydro projects, exclusions, prudence check, IDC/IEDC, controllable and uncontrollable factors, and initial spares; and additional capitalisation rules including renovation and modernisation, special allowance for thermal stations, revised emission standards capex and infirm power (p23–34).

Chapter IV begins at p35 on tariff structure. It specifies that thermal tariff has a capacity charge and an energy charge and lists the components of annual fixed cost and energy charge.

Standard name
Generation Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document