Summary written by software, from pages 1 to 35 of 83. Check the regulator's original before you rely on it.
This is JSERC’s principal multi-year tariff regulation for generating stations in Jharkhand. It was notified in the Jharkhand Gazette on 15 October 2025 and replaces the Commission’s earlier generation-tariff regulations, while expressly saving the old regime for matters up to FY 2025-26 (p1–3). It applies to generating stations or units whose tariff the Commission determines under Section 62 read with Section 86 of the Electricity Act, and excludes stations whose tariff is discovered through Section 63 competitive bidding and stations based on renewable energy sources (p3).
Chapter I (p2–14) sets title, commencement, scope, definitions and interpretation. It defines the control period as 1 April 2026 to 31 March 2031 and creates technical, financial and operational terms for thermal, hydro, pumped storage and gas generation. Section A4 makes the prescribed operating norms ceiling norms, so a generating company and beneficiaries may agree improved norms, and a PPA with better norms prevails (p14–15).
Chapter II (p15–22) establishes the MYT framework and guiding principles: business plan and capital investment plan, baseline from audited accounts, performance parameters, incentive and penalty sharing, truing up and annual performance review. It distinguishes controllable from uncontrollable factors and allows pass-through for force majeure and change in law (p15–20). Truing-up requires refund or recovery of surplus/gap with interest at Bank Rate plus 200 basis points, and delayed filings can lose carrying cost (p21).
Chapter III (p22–34) is the tariff-determination core: principles for existing and new stations, part-capacity and expansion, revised emission standards and multipurpose hydro; in-principle approval for major additional capex; detailed capital cost rules including new, existing and hydro projects, exclusions, prudence check, IDC/IEDC, controllable and uncontrollable factors, and initial spares; and additional capitalisation rules including renovation and modernisation, special allowance for thermal stations, revised emission standards capex and infirm power (p23–34).
Chapter IV begins at p35 on tariff structure. It specifies that thermal tariff has a capacity charge and an energy charge and lists the components of annual fixed cost and energy charge.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.