Fuel and Power Purchase Price Adjustment Regulations, 2025 — Draft

Tripura Electricity Regulatory Commission (Fuel and Power Purchase Price Adjustment) Regulations, 2025

Draft regulationDated 30 Oct 2025No.F.24/TERC/2025/978 dated 30 th October, 2025

Draft

A proposal that has since been finalised as the Fuel and Power Purchase Price Adjustment Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a draft TERC regulation issued on 30 October 2025 to replace the 2011 Fuel and Power Purchase Price Adjustment Formula Regulations (p1). It extends to Tripura and is to commence on publication in the Tripura Gazette; the Gazette date is not printed (p1, p7). It is made under specified provisions of the Electricity Act 2003 and in compliance with Rule 14 of the Electricity (Amendment) Rules 2022 (p1).

Regulation 2 defines the framework's vocabulary, including FPPPA surcharge, deviation, DSM, ancillary services, current/ensuing/previous year, licensee, generating company, tariff and SCED (p1–2). Regulation 3 sets the monthly FPPPA surcharge formula: it compares actual and projected power purchase cost, actual and base transmission charges, and incorporates procurement, bulk sale, distribution and inter-state transmission losses and average billing rate (p2–3). It excludes DSM charges and excludes ancillary services and SCED from the surcharge, leaving those to true-up (p3). It also requires thermal generating companies to compute fuel cost adjustment per station per month, with a gas-based energy charge rate formula using gross station heat rate, gas price, calorific value and auxiliary consumption (p3–4).

Regulation 4 provides for automatic monthly pass-through of the FPPPA surcharge without prior regulatory approval, subject to annual true-up (p4). It permits alternative fuel use subject to conditions and prior approval where the cost impact crosses a threshold (p4). It sets the billing lag and forfeiture of recovery if the licensee misses the timeline, allows carry-forward to avoid tariff shock with a duration cap and carrying cost, and tiers automatic recovery by size of the surcharge, with differential claims subject to Commission approval at true-up (p5). It covers excess and under recovery, true-up completion deadline, reporting and supporting documents, billing-system interoperability, and website publication of formula and computations (p5–6).

Regulation 5 deals with implementation: recovery in the n+2 month on the consumer's energy charge, monthly application without regulatory proceedings but with simultaneous information to the Commission, separate bill display, and effectiveness from Gazette publication (p6–7). It requires audited fuel and power purchase computations, procurement-plan compliance, disallowance of merit-order violation costs and excess fuel transit/handling losses, and Commission scrutiny at true-up (p7). It also creates a verification fee for FPPPA claims and routes disputes to the Conduct of Business Regulations, 2015 (p7).

Regulation 6 gives the regulations overriding effect over four named TERC regulations (p8). Regulations 7–12 preserve Commission powers to remove difficulties, issue orders and directions, relax or amend provisions, and interpret the regulations finally (p8–9). Regulation 13 repeals and replaces the 2011 Regulations, with savings for actions taken under them (p9).

Standard name
Fuel and Power Purchase Cost Adjustment
Primary topics
Fuel and power purchase cost adjustment, ARR and true-up, Fuel price and supply

Read with this

The regulation

Earlier drafts

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document