MSERC · Meghalaya State Electricity Regulatory Commission

RE Generation Tariff Regulations, 2014

Meghalaya State Electricity Regulatory Commission (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2014

RegulationDated 11 Nov 2014MSERC/REG/2014/02 dated 11th November, 2014

Replaced by a later regulation not yet published on Voltaic

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The MSERC (Terms and Conditions for determination of Tariff for Generation from Renewable Energy Sources) Regulations, 2014 (MSERC/REG/2014/02) were notified on 11 November 2014 and set the framework under which the Meghalaya State Electricity Regulatory Commission will determine tariffs for renewable generation sold to distribution licensees in the state (p1, p6). They take effect from Gazette publication — no Gazette date is printed — and remain effective up to 31.3.2017 unless reviewed or extended (p1).

Chapter 1 (pp1–6) fixes the vocabulary — Act, auxiliary consumption, banking, biomass, CUF, control period, existing and new RE projects, interconnection point, useful life, tariff period — and the scope: tariffs for supply to distribution licensees under s.62 read with s.86, subject to the eligibility criteria in Chapter 2.

Chapter 2 (pp7–10) sets eligibility (wind, small hydro up to 25 MW, Rankine-cycle biomass with a limited fossil-fuel share, MNRE-approved solar PV and thermal, biomass gasifier on producer gas) and the duties of RE generators — DPR submission, SLDC coordination and data exchange, grid code compliance — plus the routes to market: sale to the distribution licensee at Commission-determined rates, to open access consumers, or outside the state at mutually agreed rates. Open access on the state transmission and distribution systems is allowed subject to transmission/wheeling charges and adjustment of losses in kind, and to surplus capacity.

Chapter 3 (pp11–14) is the core: a three-financial-year control period, technology-wise tariff periods running from COD, generic tariff on normative parameters with no true-up, project-specific tariff on a case-to-case basis, the petition and application requirements, single-part (or two-component for fuel-based technologies) tariff structure, and levellised tariff design.

Chapter 4 (pp15–19) supplies the financial norms — capital cost treatment, debt-equity, interest on loan and working capital, depreciation, return on equity, O&M and escalation, rebate, late payment surcharge, CDM benefit sharing, subsidy and GBI adjustment, and taxes as pass-through.

Chapters 5 to 10 (pp20–30) give technology-specific parameters for wind, small hydro, biomass, solar PV, solar thermal and biomass gasifier — capital cost, CUF or PLF, auxiliary consumption, heat rate, fuel mix, calorific value, fuel price and indexation. Chapter 11 (p31) contains the deviation, relax, amend and remove-difficulty powers. The Annexures (pp32–37) provide the parameter-assumption and year-wise tariff computation forms.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document