Skip to content

JSERC · Jharkhand State Electricity Regulatory Commission

Solar PV and Solar Thermal Power Tariff Regulations, 2025

Jharkhand State Electricity Regulatory Commission (Determination of tariff for procurement of power from solar PV power project and solar thermal power project) Regulations, 2025

RegulationDated 9 Aug 2025Published in the Gazette 15 Aug 2025Notification No. 112 dated 9 th August, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is JSERC's principal tariff regulation for grid-connected solar generation, notified as Notification No. 112 and published in the Jharkhand Gazette Extraordinary (p1). It extends to the whole State of Jharkhand, comes into force on the date of Gazette publication, and stays in force up to 31 March 2028 unless reviewed earlier, with a control/review period running to the same date (p2, p4).

After a definitions chapter covering the usual tariff vocabulary plus solar-specific terms — floating solar, solar hybrid, solar with storage, storage, useful life (p2–3) — the regulation fixes its scope: tariff determination under Section 62 read with Section 86 for grid-connected RE stations commissioned during the control period, subject to eligibility criteria (p4). Eligibility turns on MNRE-approved technology for solar PV, floating and thermal; for a solar hybrid project, one renewable source must be at least 33% of total installed capacity at a common interconnection point; for solar with storage, the storage must sit at the same interconnection point as the PV project (p4).

Chapter 1 (p4–6) sets general principles: control period, tariff period tied to useful life, project-specific tariff as the default route with competitive bidding under Section 63 adopted where held, the petition procedure and documents, the tariff components, levelised tariff design, and treatment of over-generation.

Chapter 2 (p6–9) is the financial framework — capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, calculation of CUF/PLF hours, O&M expenses and escalation, rebate, late payment surcharge, subsidy/incentive treatment and statutory charges. Chapter 3 (p9) gives parameters for solar PV, solar thermal and floating solar; Chapter 4 (p10) for solar hybrid; Chapter 5 (p10–11) for solar with storage, including storage efficiency and composite/time-of-day tariff. Chapter 6 (p11–12) covers scheduling and despatch (merit-order exemption, SLDC vetting), metering and billing, outage planning and financial benefits under Jharkhand's industrial and solar policies. Chapter 7 (p12) contains deviation-from-norms, guideline precedence, and the Commission's powers to relax, remove difficulties and amend.

Notably, most parameters are left to case-by-case project-specific determination, with the regulation prescribing only ceilings, floors and financial norms (p5, p9–10).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Renewable energy tariff

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document