JSERC · Jharkhand State Electricity Regulatory Commission
Solar PV and Solar Thermal Power Tariff Regulations, 2025
Jharkhand State Electricity Regulatory Commission (Determination of tariff for procurement of power from solar PV power project and solar thermal power project) Regulations, 2025
RegulationDated 9 Aug 2025Published in the Gazette 15 Aug 2025Notification No. 112 dated 9 th August, 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is JSERC's principal tariff regulation for grid-connected solar generation, notified as Notification No. 112 and published in the Jharkhand Gazette Extraordinary (p1). It extends to the whole State of Jharkhand, comes into force on the date of Gazette publication, and stays in force up to 31 March 2028 unless reviewed earlier, with a control/review period running to the same date (p2, p4).
After a definitions chapter covering the usual tariff vocabulary plus solar-specific terms — floating solar, solar hybrid, solar with storage, storage, useful life (p2–3) — the regulation fixes its scope: tariff determination under Section 62 read with Section 86 for grid-connected RE stations commissioned during the control period, subject to eligibility criteria (p4). Eligibility turns on MNRE-approved technology for solar PV, floating and thermal; for a solar hybrid project, one renewable source must be at least 33% of total installed capacity at a common interconnection point; for solar with storage, the storage must sit at the same interconnection point as the PV project (p4).
Chapter 1 (p4–6) sets general principles: control period, tariff period tied to useful life, project-specific tariff as the default route with competitive bidding under Section 63 adopted where held, the petition procedure and documents, the tariff components, levelised tariff design, and treatment of over-generation.
Chapter 2 (p6–9) is the financial framework — capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, calculation of CUF/PLF hours, O&M expenses and escalation, rebate, late payment surcharge, subsidy/incentive treatment and statutory charges. Chapter 3 (p9) gives parameters for solar PV, solar thermal and floating solar; Chapter 4 (p10) for solar hybrid; Chapter 5 (p10–11) for solar with storage, including storage efficiency and composite/time-of-day tariff. Chapter 6 (p11–12) covers scheduling and despatch (merit-order exemption, SLDC vetting), metering and billing, outage planning and financial benefits under Jharkhand's industrial and solar policies. Chapter 7 (p12) contains deviation-from-norms, guideline precedence, and the Commission's powers to relax, remove difficulties and amend.
Notably, most parameters are left to case-by-case project-specific determination, with the regulation prescribing only ceilings, floors and financial norms (p5, p9–10).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.