MPERC · Madhya Pradesh Electricity Regulatory Commission
MP Gazette Notification dated 28 March 2025
MP Gazette Notification dated 28-MARCH-2025
RegulationDated 28 Mar 2025Published in the Gazette 28 Mar 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
Only three page-fragments survive: a table skeleton (p10), a stub reading 'THE … amendment)' (p12), and a run of clause text (p13). What can be read concerns a consumer whose requisitioned sanctioned load or contract demand is increased beyond the permissible limit at a particular voltage level, or who wishes to switch to a higher voltage despite already having a contract demand eligible for a higher load limit — such a consumer is required to pay a Supply Affording Charge (p13). The clause cross-refers to the Madhya Pradesh Electricity Supply Code, 2021 as amended from time to time (p13), which suggests this is an amendment touching supply-affording charges or voltage-wise load thresholds, but the operative amendment, its number and its effective date are not recoverable from the text. The catalogue gives the gazette date as 28-MARCH-2025.
Read with this
Amendments and corrections
- Date not statedShuddhi Patra (corrigendum) for RG-31(II) of 2022
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.