APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Arunachal Pradesh Framework for Resource Adequacy Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024
RegulationDated 14 May 2024Published in the Gazette 16 May 2024No. APSERC/Notification/45/2024 dated The 14th May, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APSERC's principal regulation on resource adequacy: the state framework for planning generation and transmission so that projected demand is met reliably with an optimal generation mix (p1–2). It is made under s.181 read with ss.61, 66 and 86 of the Electricity Act 2003, notified on 14 May 2024 and published in the Arunachal Pradesh Gazette on 16 May 2024; it extends to the whole state and comes into force from notification in the Official Gazette (p1).
Chapter 1 fixes the title, extent, objective and applicability — generating companies, distribution licensees, SLDC, STU and other grid-connected entities in the state — and defines the concepts that drive the rest of the text: capacity credit, EENS, LOLP, NENS, planning reserve margin, net load, and the long/medium/short-term plan horizons (p1–2). Chapter 2 frames the four steps of the framework: demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance, and requires the distribution licensee to prepare LT-, MT- and ST-DRAPs (p2).
Chapter 3 (pp2–4) specifies how demand is to be forecast: hourly or sub-hourly assessment per retail-tariff consumer category, a menu of acceptable forecasting methods, selection by statistical fit, adjustment for policy and demand-side drivers, scenario analysis across at least three scenarios, and annual rolling submission from licensee to SLDC to STU and onward to the Authority, NLDC and NERLDC.
Chapter 4 (pp4–6) governs generation resource planning: mapping existing, upcoming and retiring contracted resources with their technical characteristics, computing capacity credit factors on a net-load basis with a rolling five-year average, differential treatment of hydro and thermal resources, a planning reserve margin keyed to reliability indices, and derivation of the resource gap the DRAPs must close, with state allocations tied to the national coincident peak.
Chapter 5 (pp6–7) covers procurement: least-cost optimal resource mix, intra-regional before inter-regional contracting, banded long/medium/short-term contract tenures, annual rolling plans, and use of centrally created capacity-sharing or trading platforms. Chapter 6 (p7) provides for monitoring, reporting of shortfalls and a non-compliance charge. Chapter 7 (pp7–8) sets data-sharing duties and the annual calendar of submissions by licensees, SLDC and STU. Chapter 8 (p8) reserves the Commission's powers to direct, relax and remove difficulties.
Read with this
No other documents to read with it are on Voltaic.
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft.
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.