Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Compliance Audit Regulations, 2010

Madhya Pradesh Electricity Regulatory Commission (Compliance Audit) Regulations, 2010 (G – 36 of 2010)

RegulationDated 27 Oct 2010Published in the Gazette 5 Nov 2010No. 2910/MPERC-2010 dated 27th October, 2010

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Madhya Pradesh Electricity Regulatory Commission (Compliance Audit) Regulations, 2010 create a regime under which the Commission can audit whether the entities it regulates are complying with the Electricity Act, rules and regulations made under it, and the Commission's own orders and directions. They were notified as No. 2910/MPERC-2010, dated Bhopal 27 October 2010, published in the Gazette on 5 November 2010, apply to the whole of Madhya Pradesh, and come into force from the date of publication in the Official Gazette (p1). The stated trigger is a Forum of Regulators prescription on compliance audit of regulated entities (p1).

Regulation 3 defines the two terms the regime turns on — the Act, and the "Regulated Entity", which covers distribution, generation, transmission and trading licensees and the State Load Despatch Centre (p1). Regulation 4 gives the Commission power to audit these entities at any time and describes how it obtains help: empanelling consultants/auditors by order, choosing between empanelled firms, running a fresh selection, or single-source selection in exceptional cases, with a Terms of Reference framed before the audit starts (p1–2).

Regulation 5 is the independence and qualification chapter: no conflict of interest, a two-year bar on holding office or any commercial interest in the audited entity, a written declaration of no conflict, task-dependent minimum qualifications, a minimum experience requirement, and fees set separately in the ToR (p2–3). Regulation 6 has the Commission pay audit expenses but requires the Regulated Entity to reimburse them within a month, and sets out how each type of licensee may recover the cost — ARR pass-through for distribution, tariff filing for generation and transmission, trading margin for traders, annual budget for the SLDC (p3).

Regulation 7 is the working methodology: inspection and investigation powers, a minimum 15 days' advance written notice, the entity's duty to produce books, registers and information, evidence gathering through data requests, site visits, interviews, analysis and third-party complaints, and the mandatory contents of the auditor's report together with a signed statement (p3–5). Regulation 8 lets the Commission act on a report after giving the entity a reasonable opportunity to represent. Regulations 9–11 cover removal of difficulties, amendment, and orders and practice directions (p5).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting, Enforcement and penalties

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document