GERC · Gujarat Electricity Regulatory Commission
Multi-Year Tariff Regulations, 2010 — Draft
Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2010
Draft regulationDated 17 Nov 2010
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2010, in draft form, set the framework and terms for determining tariffs for generation, intra-State transmission, distribution wires and retail supply in Gujarat for a five-year Control Period beginning 1 April 2011 (p1, p4, p14). They replace the 2005 tariff terms and 2007 MYT framework regulations and apply to all existing and future generating companies, transmission licensees and distribution licensees (p1, p3).
Chapter 1 (p1–13) defines terms such as accounting and allocation statements, ARR, availability, declared capacity, business plan, control period and useful life. Chapter 2 (p14–29) lays out the MYT process: business plan, multi-year ARR forecast, annual tariff determination, truing-up, pass-through of uncontrollable gains/losses, sharing of controllable gains/losses, filing and publication procedure, and the tariff order timeline. Chapter 3 (p30–38) sets financial principles — debt-equity, capital cost and additional capitalisation, consumer contributions, return on equity, interest, depreciation, working capital and income tax.
Chapter 4 (p39–62) sets generation tariff components and operating norms for thermal and hydro stations — availability, heat rate, secondary fuel oil, auxiliary consumption, transit losses, O&M, annual fixed and energy charges, incentives, reactive energy charges and penalties for mis-declaration. Chapter 5 (p63–69) governs intra-State transmission tariffs, availability norms, ARR components, charge sharing among open access users, incentive, rebate, late payment surcharge and transmission losses. Chapter 6 (p70–76) covers distribution wires business — ARR, allocation matrix, wheeling charges, wheeling losses and wires availability. Chapter 7 (p77–82) covers retail supply — sales forecast, ARR components, power purchase cost, transmission charges, O&M norms, non-tariff income, cross-subsidy surcharge and distribution losses. Annexure I (p83–85) gives the straight-line depreciation schedule; Annexure II (p86–90) prescribes the method for calculating transmission system availability and surge impedance loading values.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.