Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

Promotion of Green Energy through Renewable Purchase Obligation Regulations, 2010 — First Amendment, 2019

Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable Purchase Obligation) (First Amendment) Regulations, 2019

AmendmentDated 16 Aug 2019UPERC/Secy/Regulation/2019- 294 dated August 16, 2019

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-page amendment notification (p1) by which the Uttar Pradesh Electricity Regulatory Commission rewrites parts of its 2010 Promotion of Green Energy through Renewable Purchase Obligation Regulations. It takes effect from Gazette publication, but no Gazette date is printed (p1).

The first change adds a definition of Hydropower Purchase Obligation inside Non-Solar RPO (p1), tied to large hydro commissioned after the Ministry of Power memorandum of 8 March 2019 and to the untied capacity of already-commissioned projects, with the Non-Solar percentage enlarged so other renewables are not squeezed. Regulation 4's RPO table is then replaced by two tables — the historical trajectory up to FY 2018-19 and a new FY 2019-20 to FY 2023-24 trajectory that splits Non-Solar into 'Other Non-Solar' and HPO alongside Solar (p1–2).

The remaining amendments are to compliance mechanics: the fungibility proviso is replaced so that shortfalls can be met from excess energy of the other category once the 85% compliance threshold is crossed, and Other Non-Solar and HPO are made fully fungible (p2–3); a new proviso puts RPO on total consumption from FY 2016-17 but excludes consumption met from hydro sources not covered by HPO (p3); the RPO fixed for FY 2023-24 continues until revised (p3); annual and quarterly RPO returns are required, with a roadmap for shortfalls (p3); and captive power plants get their RPO frozen at the level of their commissioning year, with extra obligation on capacity addition (p3). Finally, RPO Regulatory Charges are re-based to REC floor prices and the Regulatory Fund's permitted uses are widened, including payments to UPNEDA or another notified State agency, while the clause empowering the State Agency to buy certificates is dropped (p3–4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

The regulation itself is not yet published on Voltaic.

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a main regulation not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document