Skip to content

AERC · Assam Electricity Regulatory Commission

Micro/Mini-Grid Renewable Energy Generation and Supply Regulations, 2017

AERC (Micro/Mini-Grid Renewable Energy Generation and Supply) Regulations, 2017

RegulationDated 6 Jan 2018Published in the Gazette 6 Feb 2018No. 638/2017 dated The 6th January, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Assam Electricity Regulatory Commission makes this principal regulation under the Electricity Act, 2003 to govern renewable micro- and mini-grid projects across Assam (p1). It is notified as No. 638/2017 and dated 6 January 2018, but the Gazette issue carrying it is dated 6 February 2018; it says it comes into force from publication in the Assam Gazette (p1). It applies to the whole state and defines micro-grids as projects up to 10 kWp and mini-grids as above 10 kWp up to 500 kWp (p2–4).

Part A applies it to new and existing micro/mini-grid projects supplying rural consumers, with existing projects required to comply with CEA safety and connectivity regulations within six months; projects built with central/state financial assistance follow their own funding guidelines (p4). Part B sets out the business models: MGO applies to the distribution licensee for an NOC before construction; on grid arrival, supply shifts to the licensee at Commission-determined feed-in tariff; the licensee may take over billing and collection or engage the MGO as distribution franchisee; the MGO may transfer its primary distribution network at book value (p4–5).

Part C covers technical standards for the network, interconnection, safety and metering, largely by reference to CEA regulations (p5–6). Part D provides energy accounting and settlement rules before and after grid arrival and for franchisee operation, and confirms RPO eligibility and REC applicability (p6–7). Part E deals with the PPA, termination and exit (p7–8). Part F assigns roles to the State Nodal Agency, distribution licensee, MGO and consumers (p8–9). Part G covers payment security, ARR recovery, a state technical committee, grievance redressal, implementation guidelines and the Commission's powers to direct, relax, remove difficulties and amend (p9–11).

Standard name
Mini-grid and Micro-grid
Primary topics
Mini-grid and micro-grid, Rural electrification, Renewable energy tariff

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document