AERC · Assam Electricity Regulatory Commission
Micro/Mini-Grid Renewable Energy Generation and Supply Regulations, 2017
AERC (Micro/Mini-Grid Renewable Energy Generation and Supply) Regulations, 2017
RegulationDated 6 Jan 2018Published in the Gazette 6 Feb 2018No. 638/2017 dated The 6th January, 2018
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission makes this principal regulation under the Electricity Act, 2003 to govern renewable micro- and mini-grid projects across Assam (p1). It is notified as No. 638/2017 and dated 6 January 2018, but the Gazette issue carrying it is dated 6 February 2018; it says it comes into force from publication in the Assam Gazette (p1). It applies to the whole state and defines micro-grids as projects up to 10 kWp and mini-grids as above 10 kWp up to 500 kWp (p2–4).
Part A applies it to new and existing micro/mini-grid projects supplying rural consumers, with existing projects required to comply with CEA safety and connectivity regulations within six months; projects built with central/state financial assistance follow their own funding guidelines (p4). Part B sets out the business models: MGO applies to the distribution licensee for an NOC before construction; on grid arrival, supply shifts to the licensee at Commission-determined feed-in tariff; the licensee may take over billing and collection or engage the MGO as distribution franchisee; the MGO may transfer its primary distribution network at book value (p4–5).
Part C covers technical standards for the network, interconnection, safety and metering, largely by reference to CEA regulations (p5–6). Part D provides energy accounting and settlement rules before and after grid arrival and for franchisee operation, and confirms RPO eligibility and REC applicability (p6–7). Part E deals with the PPA, termination and exit (p7–8). Part F assigns roles to the State Nodal Agency, distribution licensee, MGO and consumers (p8–9). Part G covers payment security, ARR recovery, a state technical committee, grievance redressal, implementation guidelines and the Commission's powers to direct, relax, remove difficulties and amend (p9–11).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.