APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Procedure, Terms and Conditions for Grant of Distribution Licence and other Related Matters Regulations, 2024
Arunachal Pradesh State Electricity Regulatory Commission(Procedure, Terms and Conditions for grant of Distribution Licence and other related matters) Regulations, 2024
OrderDated 27 Jun 2024Published in the Gazette 3 Jul 2024No. APSERC/Notification/47/2024 dated The 27th June, 2024
Made under the Distribution of Electricity Licence (Capital Adequacy, Creditworthiness and Code of Conduct) Rules, 2005.
Summary
Summary written by software, from pages 1 to 16 of 25. Check the regulator's original before you rely on it.
This is the Arunachal Pradesh State Electricity Regulatory Commission's distribution licensing regulation — notification APSERC/Notification/47/2024 dated 27 June 2024, gazetted on 3 July 2024 (p1). Made under Section 181 of the Electricity Act 2003, it lays down how a distribution licence is applied for, granted, amended, suspended or revoked in the state, and then the general conditions that attach to every such licence. It comes into force on gazette publication (p1). The supplied text covers pages 1–16 of 25 and stops part-way through the licence conditions.
Chapter I (pp1–2) is preliminary: short title and commencement, and a long definitions clause covering roles, open access, deemed licensees and force majeure — though several definitions are drafted for transmission rather than distribution.
Chapter II (pp3–12) is the licensing procedure. Regulation 3 imports the Ministry of Power's 2005 capital adequacy, creditworthiness and code-of-conduct rules and fixes the minimum area of supply for a second licensee in an existing area. Regulations 4–5 set out the application contents, maps and draft licence, and public inspection of them. Regulations 6–18 cover the contents and form of the draft licence, receipt and scrutiny of applications, certification of due filing, public notice, inspection, objections and suggestions, hearing and local inquiry, approval or refusal, and notification of grant. Regulations 19–21 deal with applications inside an existing licensee's area, deemed licences (short-duration event supply and other persons notified by the Commission), and SEZ developers recognised as deemed distribution licensees. Regulation 22 governs commencement and a 25-year term. Regulations 23–33 cover deposit of maps and proforma, printing and deposit of the licence, amendment of an existing licence, contravention, exemption from licence, revocation, suspension and sale of the utility, approval of power purchase, standards of performance and licence fees.
Chapter III (pp12–16, continuing) sets the general conditions of the licence: duty to supply, metering, fines and charges, open access, other business, franchisee and group-company dealings, consumer grievance forums, protection of railways and highways, competition, cooperation with STU and SLDC, investments, procurement, revenue and tariff filings, accounts and audit, prohibition of subsidies, information reporting, and prior approval for mergers or acquisitions.
Read with this
The regulation
Earlier drafts
- Dated 29 May 2024Distribution Licence Grant Procedure and Conditions Regulations, 2024 — Draft
- Dated 29 May 2024Public notice: Draft Distribution Licence Terms & Conditions Regulations, 2024 — Public Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.