Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Procedure, Terms and Conditions for Grant of Distribution Licence and other Related Matters Regulations, 2024

Arunachal Pradesh State Electricity Regulatory Commission(Procedure, Terms and Conditions for grant of Distribution Licence and other related matters) Regulations, 2024

OrderDated 27 Jun 2024Published in the Gazette 3 Jul 2024No. APSERC/Notification/47/2024 dated The 27th June, 2024

Made under the Distribution of Electricity Licence (Capital Adequacy, Creditworthiness and Code of Conduct) Rules, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software, from pages 1 to 16 of 25. Check the regulator's original before you rely on it.

This is the Arunachal Pradesh State Electricity Regulatory Commission's distribution licensing regulation — notification APSERC/Notification/47/2024 dated 27 June 2024, gazetted on 3 July 2024 (p1). Made under Section 181 of the Electricity Act 2003, it lays down how a distribution licence is applied for, granted, amended, suspended or revoked in the state, and then the general conditions that attach to every such licence. It comes into force on gazette publication (p1). The supplied text covers pages 1–16 of 25 and stops part-way through the licence conditions.

Chapter I (pp1–2) is preliminary: short title and commencement, and a long definitions clause covering roles, open access, deemed licensees and force majeure — though several definitions are drafted for transmission rather than distribution.

Chapter II (pp3–12) is the licensing procedure. Regulation 3 imports the Ministry of Power's 2005 capital adequacy, creditworthiness and code-of-conduct rules and fixes the minimum area of supply for a second licensee in an existing area. Regulations 4–5 set out the application contents, maps and draft licence, and public inspection of them. Regulations 6–18 cover the contents and form of the draft licence, receipt and scrutiny of applications, certification of due filing, public notice, inspection, objections and suggestions, hearing and local inquiry, approval or refusal, and notification of grant. Regulations 19–21 deal with applications inside an existing licensee's area, deemed licences (short-duration event supply and other persons notified by the Commission), and SEZ developers recognised as deemed distribution licensees. Regulation 22 governs commencement and a 25-year term. Regulations 23–33 cover deposit of maps and proforma, printing and deposit of the licence, amendment of an existing licence, contravention, exemption from licence, revocation, suspension and sale of the utility, approval of power purchase, standards of performance and licence fees.

Chapter III (pp12–16, continuing) sets the general conditions of the licence: duty to supply, metering, fines and charges, open access, other business, franchisee and group-company dealings, consumer grievance forums, protection of railways and highways, competition, cooperation with STU and SLDC, investments, procurement, revenue and tariff filings, accounts and audit, prohibition of subsidies, information reporting, and prior approval for mergers or acquisitions.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Conditions of supply, Open access

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document