Skip to content

CERC · Central Electricity Regulatory Commission

Detailed Procedure for Registration, Interface and Dealing of ESCerts under the ESCerts Transaction Regulations, 2016 — 2017

DETAILED PROCEDURE FOR : I) REGISTRATION OF A DESIGNATED CONSUMER WITH REGISTRY AS ELIGIBLE ENTITY II) INTERFACE ACTIVITIES BETWEEN POWER EXCHANGES AND REGISTRY, ADMINISTRATOR AND REGISTRY AND REGISTRY AND DESIGNATED CONSUMER III) DEALING OF ENERGY SAVINGS CERTIFICATES, TRANSFER AND OTHER RESIDUAL MATTERS UNDER THE CERC (TERMS AND CONDITIONS FOR DEALING IN ENERGY SAVING CERTIFICATES) REGULATIONS, 2016

ProcedureDated 14 Feb 2017No.21/1/2014/Reg.Aff./(PATScheme-BEE)/CERC dated 14th February, 2017

Made under the Terms and Conditions for Dealing in Energy Savings Certificates Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission's letter of 14 February 2017 (p1) approves the Bureau of Energy Efficiency's procedures for transacting Energy Savings Certificates and asks BEE to publicise them. The enclosed document (p2 onward) contains three BEE-authored procedures issued under clause 7(a) of the CERC (Terms and Conditions for Dealing in Energy Saving Certificates) Regulations, 2016.

Procedure I (pp3–25) governs registration of a Designated Consumer with the Registry as an Eligible Entity. It sets out eligibility categories, the application route through the PATNet portal and hard copy, registry scrutiny and time limits, the information and documents to be verified, the roles of the Eligible Entity, Registry and Administrator, and the formats for the application, ESCerts numbering, registration certificate, checklist and document submission. It also states fees payable subject to a Commission fee order, default and revocation consequences, and a power to remove difficulties.

Procedure II (pp26–33) covers interface activities among Power Exchanges, the Registry, the Administrator and Designated Consumers. It sets out the bid-to-settlement workflow: bids on exchanges, registry cross-check of available ESCerts, treatment of defaulting sellers and over-buying buyers, discovery of market clearing price and volume through closed double-sided uniform-price auction, confirmation and approval, FIFO settlement, and the responsibilities of each entity. Information exchange is to be electronic, using the D-CRM platform.

Procedure III (pp34–35) concerns dealing, transfer and residual matters. The text available mainly specifies the weekly trading window on Tuesdays, holiday handling, bidding hours and the intraday sequence of registry confirmation, price discovery, and approval; it ends mid-procedure at clause 17.10, so later parts may be missing.

Key operating conditions: ESCerts once purchased cannot be resold (p5, p8); bilateral trading within the same corporate group is not permitted (p8); registration runs to the next PAT cycle's compliance period unless revoked (p5, p23); ESCerts validity and banking/extinguishment are addressed at pp7 and 31–32; compliance Form D is to be filed between 1 and 30 June of the compliance year (p14). Fees are left to a separate CERC order (p11, pp14–15).

Primary topics
Energy saving certificates, Power markets and exchanges, Fees payable to the Commission

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document