This is a two-page draft amendment published by the Karnataka Electricity Regulatory Commission for stakeholder comment, not a final instrument (p1–2).
The preamble gives the trigger: Karnataka has begun executing intra-state transmission projects through tariff-based competitive bidding under Ministry of Power (MoP) guidelines, and the Commission's role in that framework is confined to granting transmission licences under Sections 14, 15 and 86(1)(d) and adopting transmission charges. The KERC (Fee) Regulations, 2024 therefore need amending so the Commission can collect annual licence fees and tariff-adoption fees from transmission licensees selected through TBCB (p1).
The operative part is a two-row amendment table (p2). Clause 1(i)(b) is rewritten so that "Other Transmission Licensees" pay a flat annual fee of "Rs.20 Lakhs per Annum" instead of the existing per-MW-of-transmission-capacity fee subject to a minimum. A new Clause 7(a) is inserted requiring an application for adoption of transmission tariff filed under Section 63 of the Act to be accompanied by a fee of "Rs.25 Lakhs" (p2).
The regulations are to come into effect from the date of publication in the official gazette, which is not printed here. Stakeholders were asked to file views, comments, objections or suggestions with the Secretary within fifteen days of that gazette publication (p1–2).
Read with this
The regulation
- Dated 26 Nov 2024Fee Regulations, 2024
Amendments and corrections
- Dated 21 May 2026Fee Regulations, 2024 — First Amendment, 2026
Earlier drafts
- Dated 5 Nov 2024Fee Regulations, 2024 — Draft
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.