GERC · Gujarat Electricity Regulatory Commission
Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2017 — Draft
Gujarat Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017
Draft regulationDated 13 Jan 2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission's notification dated 13 January 2017 (p1) makes the GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017. The regulations take effect from the date of notification; the commercial mechanism follows six months later, after Gazette publication in Gujarat. The notification number is left blank in the text.
Chapter 1 (pp1–5) fixes the scope — all wind and solar generators connected to the State grid, including through pooling stations, whether selling inside or outside Gujarat or self-consuming — and defines the working vocabulary: absolute error, available capacity, deviation, gaming, pooling station, QCA, State Entity and the 15-minute time block.
Chapter 2 (pp5–6) states the objective: large-scale grid integration of variable renewables while keeping grid security, with the grid operator using wind and solar forecasts in planning and despatch and drawing on conventional flexibility and inter-grid ties.
Chapter 3 is the operational core (regulations 5–15, pp6–22). Regulation 5 is the Forecasting and Scheduling Code: mandatory day-ahead and three-day-ahead schedules, intraday revisions for wind and solar, an optional chargeable SLDC forecast service, QCA aggregation duties and a tri-party agreement with SLDC. Regulation 6 sets the qualifying criteria a QCA must satisfy — incorporation, forecasting experience, financial strength, systems, staffing and software certification. Regulation 7 carries the commercial and deviation settlement mechanism, with separate absolute-error/deviation-charge tables for wind stations commissioned before and on or after 30 January 2010 and for solar, plus an automatic annual tightening of the error bands beginning in the fourth year. Regulations 8–10 cover metering, energy accounting, SLDC–QCA software communication and access to meters. Regulation 11 explains how the State deviation charge is computed and how the residual cost is allocated to RE generators, with the first six months run without financial implications. Regulations 12–15 deal with payment security, priority of DSM payments and interest on delay, curtailment, weekly energy accounts and de-pooling methodology. Chapter 4 (p22) gives the Commission power to relax provisions and to issue directions.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.