TSERC · Telangana State Electricity Regulatory Commission
State Electricity Grid Code Regulation, 2018
Telangana Electricity Regulatory Commission (State Electricity Grid Code) Regulation, 2018
CodeDated 18 Dec 2018Published in the Gazette 28 Dec 2018No. TSERC / 4 / 2018 dated Dated 18.12.2018
Summary
Summary written by software, from pages 1 to 19 of 39. Check the regulator's original before you rely on it.
The Telangana State Electricity Regulatory Commission (State Electricity Grid Code) Regulation, 2018 is a principal state grid code made under s.181(1)(zp) read with s.86(1)(h) of the Electricity Act, 2003 (p2). It applies to the whole State of Telangana and binds transmission licensees, the SLDC, distribution licensees, generating companies, captive plants, open access consumers and other users of the intra-state transmission system (p2–3, p7).
After an introduction on the constitutional and statutory background and the A.P. Reorganisation Act, 2014 (p1), the preamble says the code must be consistent with CERC's IEGC and is meant to govern planning, development, maintenance and operation of the intra-state transmission system (p2). The document's own arrangement lists Parts A–G: General, Planning, Connection, Metering, System Operating, Scheduling and Despatch, and Miscellaneous (p2).
Clauses 1–2 set the short title, extent, commencement on gazette publication, and a long list of definitions and interpretation rules; they also say the code is to be read with the APERC supply code until TSERC notifies its own supply code, and that IEGC grid standards prevail if inconsistent (p2–7).
Part A (p7–11) specifies scope and application, a one-year compliance window for existing licensees/users on connection agreements, protection, communication, recording instruments, diagrams and metering, and the constitution, composition, meetings and review duties of the Grid Coordination Committee. It allocates roles to STU and SLDC, makes SLDC the apex body for integrated state operation, gives it functions including scheduling, system restoration, metered data, deviation/reactive/congestion accounts and REC/RPPO agency duties, and provides for disputes to be referred to the Commission (p7–11).
Part B (p11–14) is the Planning Code: it specifies how DISCOMs forecast load annually, how STU consolidates state forecasts and prepares a 10-year transmission plan updated annually, the planning philosophy and criteria (including contingency withstand requirements, redundancy, critical-load supply and communication planning), and standard/detailed planning data submission (p11–14).
Part C (p15–19) is the Connection Code: it adopts CEA connectivity/grid standards and CERC regulations, adds wind/solar-specific requirements such as LVRT and telemetry, sets harmonic distortion limits, describes the application process for new or modified connections, makes CEA metering regulations binding, requires a model connection agreement, and specifies grid parameter variations, fault clearance, protection, reactive power compensation and communication facilities (p15–19).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.