UPERC · Uttar Pradesh Electricity Regulatory Commission
Captive, Co-gen, Renewables and Other NCES Tariff Regulations, 2005
Uttar Pradesh Electricity Regulatory Commission ( Terms and Conditions for Supply of Power and Fixation of Tariff for sale of power from Captive Generating Plants, Co-generation, Renewable Sources of Energy and Other Non-Conventional Sources of Energy based Plants to a Distribution Licensee ) Regulations, 2005
RegulationDated 23 Mar 2006In force from 28 Jul 2005No. UPERC/Secy/Regulation/06- 1288 dated 23 March , 2006
Summary
Summary written by software, from pages 1 to 47 of 103. Check the regulator's original before you rely on it.
The document is UPERC's 2005 principal regulation for selling power from captive generating plants, bagasse/biomass co-generation, renewable sources and other non-conventional energy sources to distribution licensees in Uttar Pradesh. It was issued on 23 March 2006 under s.181 read with ss.9, 61 and 86(1)(a), (b), (e) of the Electricity Act, 2003, but it says it came into force retrospectively from 28 July 2005 and will remain in force for five years unless reviewed or extended; the earlier Practice Directions on captive generation and renewable-energy IPPs are repealed from that date (p1).
Chapter 1 (p1–8) contains short title, commencement, scope, tariff-determination principles, PPA approval route and definitions. It applies in Uttar Pradesh to captive plants, bagasse/biomass co-generation, renewable and other non-conventional plants (p2). It adopts ABT as and when notified, encourages CDM/carbon trading, and leaves other co-generation tariffs to case-by-case determination (p2–3).
Chapter 2 (p9–19) is the captive-power chapter. It defines when a plant qualifies as a captive generating plant: at least 26% ownership by captive users and at least 51% of annual generation consumed for captive use, with special rules for co-operatives, associations and SPVs (p9–11). It applies to existing and proposed captive plants of 3 MW or above, irrespective of grid connectivity (p11). It then sets obligations and duties — technical standards, grid discipline, SLDC coordination, ABT compliance, metering, dedicated lines, penalties for ignoring SLDC directions, and dispute reference to the Commission (p12–16). It gives captive plants open access for own use, exempts them from surcharge for that use, and covers transmission/wheeling charges, sale of surplus to the distribution licensee through a Commission-approved PPA, emergency supply, tariff, purchase of electricity, capacity/location and environmental clearance (p16–19).
Chapter 3 (p20–31) mirrors this for co-generation, renewable and other non-conventional plants. It promotes these sources, deems them generating stations under s.7, covers existing and future plants, requires DPRs and Annexure 2 information, and sets technical, environmental, grid and SLDC duties (p20–27). Sale to the local distribution licensee is at Schedule II rates, but purchases are capped at 7.5% of the licensee's total power purchase in MUs; surplus may be sold to others under open access (p27–28). Unlike captive plants, these plants are liable to surcharge/additional surcharge for open access for own use (p30).
Chapter 4 (p32–39) contains common evacuation, maintenance, metering, energy-accounting, banking, payment and miscellaneous provisions. It requires 33 kV/132 kV (or 11 kV for some non-conventional plants) evacuation, ABT-compatible special energy meters, SLDC accounting, banking rules with peak-hour restrictions and 12.5% banking charges, and a revolving LC payment mechanism with rebate/surcharge terms (p32–38). The Commission may relax provisions and refer technical matters to CEA (p39).
Schedules I and II (p40–47) set the tariff structures: one-part tariffs for coal-based captive plants (firm and infirm) and diesel-based plants, and for bagasse/biomass cogeneration and mini/micro/canal hydel below 25 MW, with variable cost, escalating/non-escalating fixed cost, effective tariff, incentive and rounding provisions. Annexures 1–4, referenced for DPR formats, information formats and the model PPA, are not in these pages (p11, p17, p22–24).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: an amendment not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.