NERC · Nagaland Electricity Regulatory Commission

Renewable Purchase Obligation and its Compliance Regulations, 2011

Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011

RegulationDated 29 Aug 2011No.NERC/REGN/2011 dated 29th Aug. '11

4 amendments to it are on Voltaic, the latest dated 3 Aug 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Nagaland Electricity Regulatory Commission's principal regulation creating a Renewable Purchase Obligation (RPO) regime for the State, notified in Kohima on 29 August 2011 as No. NERC/REGN/2011 under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p1). It takes effect on publication in the Nagaland Official Gazette; the Gazette date is not printed (p1). It extends to the whole State and to all matters within the Commission's jurisdiction (p1).

Chapter I sets the short title, commencement and extent (p1). A definitions chapter (pp2–4) fixes the working vocabulary — Central Agency, Certificate, Forbearance Price, State Agency, Obligated Entity, Eligible Entity, Preferential Tariff, Interconnection Point and Project Line(s) — and imports the CERC Renewable Energy Certificate framework of 2010 as the reference for certificates and price caps.

Section 1 (pp4–7) is about promoting RE generation: mandatory open access for RE generators of any size, the obligation on distribution licensees to buy a minimum share of renewable energy to be stipulated in Commission orders, evacuation and interconnection obligations on the STU/distribution licensee, cost responsibility and pass-through, joint evacuation arrangements, a year-in-advance evacuation augmentation plan with penalties for slippage, and build-and-transfer of transmission assets by generators with repayment over five instalments.

Section 2 (pp7–9) contains the RPO itself: a shrinking-distance schedule of minimum renewable purchase as a percentage of the licensee's annual consumption for 2010-11 to 2012-13, with a solar carve-out and the mandate that future years be specified separately by the Commission. It sets how the licensee reports its renewable purchases in the ARR, sourcing preference within its own area of supply before looking outside, priority by date of commercial operation, a three-yearly review power, and a waiver power for supply constraints. The obligation binds the distribution licensee and any person consuming 1 MW and above from conventional captive generation or procured through open access/third-party sale (pp8–9).

Section 3 (pp9–10) makes CERC renewable energy certificates the valid instrument for discharging the obligation, separates solar from non-solar certificates, and requires certificates bought on power exchanges to be deposited with the Commission through the Central Agency's procedure.

Section 4 (pp10–11) covers the State Agency: designation, the State Government's "Competent Authority" acting as State Agency for registration of projects, quarterly compliance reporting to the Commission, remuneration, and replacement of a non-performing agency.

Section 5 (pp11–12) governs tariff for renewable and cogeneration purchases: mutual agreement within a Commission price cap, submission of cost data and MOU/PPA, reference of disputes to the Commission by petition, source-wise tariff determination under the NERC RE tariff regulations, and tariff review after five years applying to agreements entered into thereafter.

Section 6 (pp12–13) handles default: a separate fund equal to the shortfall valued at the forbearance price, its use to buy certificates, licence breach for non-deposit within 15 days, penalty under section 142, and carry-forward of compliance where certificates are genuinely unavailable.

Sections 7 to 11 (pp13–14) give these regulations overriding effect over the NERC Tariff Regulations 2010 and the NERC Open Access Regulations in matters of RE generation and purchase, and reserve to the Commission powers to remove difficulties, issue orders and practice directions, depart from its own procedure, and interpret the regulations finally. The regulation is signed by P. Sani, Dy. Director-cum-Commission Secretary, NERC, Kohima (p14).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a procedure or order made under it.

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.