AGRAHAYANA 9]
TUESDAY, NOVEMBER 30, 2021
[SAKA 1943
PART I—Orders and Notifications by the Governor of West Bengal, the High Court, Government Treasury, etc.
No. 69/WBERC
Dated 26.11.2021
In exercise of the powers conferred and sub-section (1) and clause (zp) of subsection (2) of section 181 of the Electricity Act, 2003 (36 of 2003) with sub-section (2) and (3) of section 32, clause (d) of sub-section (2) of section 39, clause (c) of section 40 and clause (h) of section (1) of section 86 and clause (i) of sub-section (2) section 86 of the Electricity Act, 2003 (36 of 2003) and the Electricity [Removal of Difficulties] Third Order, 2005 and all powers enabling it in this behalf, and in supersession of Notification No. 40/WBERC dated 25.03.2008 published in Kolkata Gazette, Extraordinary on 25.03.2008 and Notification No. 42/WBERC dated 22.05.2009 published in the Kolkata Gazette Extraordinary Part I on 22.05.2009 Dated 22 May, 2009, the West Bengal Electricity Regulatory Commission hereby makes the following Regulations:
In pursuance of the Tariff Regulations, the State Level Accounts for energy charge shall be prepared along-with actual availability of the generating stations for any month and shall be issued in following manner:
The same shall be done for an embedded generating station (i.e., any generating station connected with the distribution network of any Distribution Licensee including any generating stations owned by the Distribution Licensee, as specified in DSM Regulations) supplying power to the distribution licensee to whose distribution system such embedded generating station is connected and for whom energy charge and capacity charge based two part tariff is applicable as per PPA or Tariff Regulations, along with determination of the Plant Availability Factor (PAF) of such generating stations. Though embedded generating stations shall not come under Deviation Settlement (DS) mechanism to the extent as detailed in the DSM Regulations, they shall be under obligation to demonstrate their Declared Capacity to establish the PAF.
In the daily statement the cumulative total scheduled energy entitled for energy charge, achievement of Actual Declared Capacity, achievement of Notional Declared Capacity, Resultant Actual Availability and Resultant Notional Availability are to be shown separately for each entity. Such statement shall also show total number of Time Block(s) which achieved the initial schedule of injection as specified in paragraph 2 of Schedule-10 of Tariff Regulations.
For computation of the Resultant Actual Availability and / or Resultant Notional Availability for the period where there is no declared demonstration and the implemented scheduled injection is less than the Actual Declared Capacity or Notional Declared Capacity, the Resultant Actual Availability or Resultant Notional Availability will be the Actual Declared Capacity or Notional Declared Capacity respectively subject to other specific conditions in any Regulation of the Commission in relation to availability determination methodology as specified. For frequency above 50 Hz, the Resultant Actual Availability / Notional Availability shall be the actual Declared Capacity / Notional Declared capacity as the case may be.
The cumulative total of those items for the year shall also be provided. In the last month of the year the Reliability Index of Generation Injection Schedule and annual Plant Load Factor of the generating station for the purpose of incentive on overall generation as per paragraph 1 and paragraph-2 of Schedule-10 of Tariff Regulations are to be declared separately.
In pursuance of DSM Regulations, the State Level Accounts for DS Charges shall be prepared and issued in the following manner:
If in any Time Block due to gaming Commission orders for adjustment of deviated energy in a particular way through any order then such adjustment shall be done against such Time Block and if required, by revision of the said daily statement if by such time the monthly statement has not been published. However, if the monthly statement is already published then a separate statement for such financial adjustment shall be done by SLDC and accordingly issued for treatment of such adjustment separately.
In the daily statement, the algebraic sum of Deviated energy as calculated and amount payable or receivable by each entity is to be shown separately. The impact of gaming as covered above and 3.6.2 of the DSM Regulations in relation to Open Access Customers or any other entity are also to be shown separately. In addition, the statement shall also contain calculation of reactive energy charges for each Time Block. Moreover, the deviated amount considered for sign change charges shall be calculated as per the procedure laid down in DSM Regulations and shall be given in Table B and Table C in Annexure-II and Annexure-III respectively. The daily accounts for payable amount of Reactive Energy charges shall be computed on the basis of Table-D in Annexure-IV. This statement shall capture the amount payable in rupees as reactive energy charge along with total kVArh considered for such payable charge.
Such weekly statement of State level account of DS Charge shall be prepared for the week and issued to the all concerned entities within three working days of receipt of DS Charge statement from Eastern Regional Power Committee for that week. The date of issuance of such weekly statement will be considered as billing date as per regulation 7.2 of the State Grid Code.
The "SLDC-DS-FUND-WBSETCL" shall be maintained in a scheduled public sector bank / scheduled private sector bank for the purpose of managing DS Charges in pursuance of regulation 5.3 of the DSM Regulations. The SLDC-DS FUND-WBSETCL shall be managed in the following manners:
Provided that in case of failure to draw any fund by the DDO from the LC account due to any fault of the entity then the entity will have to bear the penalty for default in timely payment of any weekly bill as per regulation 7.2 of the State Grid Code.
Each entity under the purview of DS mechanism shall open an irrevocable, revolving, unconditional and non-recourse letter of credit (LC) in favour of the "SLDC-DS-FUND-WBSETCL" for an amount of Rs. 10 Lakhs. Such LC has to be open with a scheduled public sector bank / scheduled private sector bank, having branch office in Kolkata, at initial stage of starting of entity's operation in the State Grid. Post three months of commencement of DS, the amount of LC shall be updated to an amount equivalent to weekly DS Charges for the two weeks in the past three months where such weekly DS Charges were the highest subject to this amount being at least Rs. 10 Lakhs. For the entities under ABT mode who have already opened such LC, the same shall continue. In case of non-compliance by any entity, SLDC shall intimate the same to the Commission for initiation of action under section 142 of the Electricity Act 2003.
On the basis of the above accounting, a daily report sheet is to be prepared by SLDC showing energy balancing of the State Grid, which shall be submitted to the Commission every month by consolidating weekly data for the weeks of the preceding month (hereinafter referred to as Reporting Month). In case of any fractional week at the end of the Reporting Month the report of such week shall be submitted with the report of the month subsequent to the Reporting Month.
Energy Balancing for this purpose will mean the accounting for amount of energy injected in the intra-state transmission system and usage of such energy through drawal by different entities along with actual transmission losses incurred in this process.
In case a dispute arises under this Balancing and Settlement Code including a dispute in relation to accounting of deviated energy, then to resolve such dispute and to derive corresponding charges, SLDC shall form a State Power Committee with representatives from the concerned entities and SLDC. The officer-in-charge of SLDC shall be the Chairman of the Committee. The Committee shall preferably meet once in two months. However, the Chairman
of the Committee may schedule any meeting to deal with urgent affairs, as and when required, with a notice of two days. Each entity shall nominate a suitable representative to serve in the Committee. In case of nonsettlement of the disputed issue or any difficulty faced by the Committee to give effect to the provisions of these Regulations, the matter shall be referred to the Commission by the SLDC along with the findings of the Committee.
The treatment of Infirm Power shall be as under:
If any difficulty arises in giving effect to any of the provisions of this Balancing and Settlement Code, the Commission may, for reasons to be recorded in writing, direct the licensee or generating company or SLDC or Open Access Customer for taking suitable actions, not inconsistent with the provisions of the Act, as may appear to be necessary for removing the difficulty.
Subject to the provisions of the Act, the Commission may from time to time issue orders and practice directions with regards to the implementation of this Balancing and Settlement Code. Such orders or practice directions may be issued suo-moto by the Commission or upon an application made by any affected party.
The West Bengal Electricity Regulatory Commission (Balancing and Settlement Code) Regulations, 2008 issued under Notification No.40/WBERC dated 25.03.2008 published in the Kolkata Gazette Extraordinary on 25.03.2008 and West Bengal Electricity Regulatory Commission (Balancing and Settlement Code) (Amendment) Regulations, 2009 under Notification No. 42/WBERC dated 22.05.2009 published in the Kolkata Gazette Extraordinary Part I on 22.05.2009 is hereby repealed. Notwithstanding such repeal, anything done or any action already taken under the repealed Regulations, shall in so far as it is not inconsistent with the West Bengal Electricity Regulatory Commission (Balancing and Settlement Code) Regulations, 2021, be deemed to have been done or taken under the corresponding provisions of the West Bengal Electricity Regulatory Commission (Balancing and Settlement Code) Regulations, 2021.
TABLE-A
| Serial no. of Time Block | Whether the block is under demonstration for | Result of the demonstration * | Resultant Penalty in case of capacity charge in rupees** | Resultant availability (MWh) | Whether actual generation achieved the Initial Schedule of injection ***** | Frequency (Hz) | Actual Generation | Unit loading in % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actual Declared Capacity (*****) | Notional Declared Capacity (*****) | Initial Schedule of Injection (MWh)*** | Implemented Energy injection (MWh) | Actual declared capacity (Yes/No) | Notional declared capacity (Yes/No) | Actual declared capacity | Notional declared capacity | Actual declared capacity | Notional declared capacity | |||||
| 1 | ||||||||||||||
| 2 | ||||||||||||||
| . | ||||||||||||||
| - | ||||||||||||||
| - | ||||||||||||||
| 96 |
Coal Stock declared = MT
*Result of the demonstration shall be indicated through codification where '0' stands for successful demonstration of declared capacity and any 1 shall represent mis-declaration for the block concerned and the sum of the column shall represent the number of mis-declarations for the day concerned
**As per regulation 5.7.2 of Tariff Regulation
***The injection Schedule allotted by SLDC to the generating stations ahead of the day
****This is required to find out the reliability index of Generation Injection Schedule. If initial schedule of injection is achieved as specified in paragraph 2 of Schedule 10 of the Tariff Regulations then such will be indicated by '1' and in case of failure it will stand as '0'
*****As per regulation 5.7.4 of Tariff Regulation
TABLE-B
STATEMENT ON ACCOUNT OF DEVIATION SETTLEMENT CHARGES FOR EACH TIME BLOCK
| Time Block | Scheduled (MWh) | Actual Injection/drawal in (MWh) | Deviated Energy in kWh along with (+)/(-) | Average Frequency in HZ | Rate of DS Charge in paise/kwhr | Applicable DS Charge in Rs (+ means receivable/- means payable) as per regulation 3.2 of DSM Regulations | Disallowance Amount in Rs on application of regulations 3.4, 3.6 and 3.7.2 of DSM Regulations | Reasons of disallowance in column 8 | Additional Charges as per Regulation 3.3 of DSM Regulations (except regulation 3.3.9, 3.3.11 and 3.3.12) | Total Charges Receivables / Payable for deviation | Energy MWh for Sign Change Charge |
|---|---|---|---|---|---|---|---|---|---|---|---|
| (1) | (2) | (3) | (4) = {(3) - (2)} * 1000 | (5) | (6) | (7) = (4) × (6) × 0.01 | (8) | (9) | (10) | (11) = (7) - (8) + (10) | (12) |
| 1 | |||||||||||
| 2 | |||||||||||
| ... | |||||||||||
| 96 | |||||||||||
| Total |
* - (+) represent gain of DS Charge and (-) representing loss of DS
Daily Base DSM Charge (DBDC) =
Summation of value of column (7)
| (1) Total Actual Energy drawn/injected in all the blocks | = ..... |
| (2) Total Schedule energy drawn/injected in all the blocks | = ..... |
| (3) Total Deviated Energy in all the blocks by taking absolute value without the sign | = ..... |
| (4) The Deviation of actual energy with respect to Scheduled Energy | = (3) × 100 / (2) |
| (5) Additional Charges by the entity as per clause 3.3.9 of DSM Regulations | = 0.2 × DBDC |
Annex IV
TABLE-D
| SI No | Name of the Line | Meter no | MVarH_High [injection (+) / drawal (-)] |
Reactive Charge MVarH_High [Payable (-) / receivable (+)] (Rs.) |
MVarH-Low [injection (+) / drawal (-)] |
Reactive Charge MVarH_Low [Payable (-) / receivable (+)] (Rs.) |
Net Reactive Charge (Rs.) |
|---|---|---|---|---|---|---|---|
| (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) |
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| .... | |||||||
| .... | |||||||
| .... | |||||||
| .... | |||||||
| .... | |||||||
| Total |
Net Reactive Energy Charges payable (-) / receivable (+) in Rs = Total of Column (H)
Note: Based on the daily statement weekly statement shall be prepared.
By order of the Commission,
Place: Kolkata
Dated: 26.11.2021
MAUSUMI GUHA ROY, IAS
Secretary of the Commission