Formats for Multi Year Tariff Filings by the Generating Company Order, 2013

Himachal Pradesh Electricity Regulatory Commission (Formats for Multi Year Tariff Filings by the Generating Company) Order, 2013

OrderDated 1 Nov 2013No. HPERC/F(5)(3)(1)(Gen) dated 1st November, 2013

Made under the Guidelines and Formats for Tariff Filing Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short HPERC order that revises the formats a generating company must use when filing its Multi Year Tariff petition. It was issued on 1 November 2013 and comes into force on publication in the Himachal Pradesh Rajpatra; the Rajpatra date is not printed (p1). The formats apply to MYT filings for the control period beginning 1 April 2014 and thereafter (p1).

Paragraph 1 gives the short title and commencement. Paragraph 2 defines “Act” (Electricity Act, 2003), “Annexure” and “Form”, and carries over definitions from the Act and regulations. Paragraph 3 requires the generating company to file in the forms in the Annexure, which are also to be hosted on the HPERC website. The Commission may allow modifications or variations to fit the circumstances of a case, and where no form covers a contingency, a form approved by the Commission must be used (p1).

The Annexure is presented as an Index of Regulatory Compliance Formats for Tariff Filing by Generating Company (p2). Part A, Summary Formats, covers annual revenue requirement; return on equity; commercial operation date, type of hydro station, capacity index, primary design energy and peaking capability (month-wise) for run-of-river stations; and salient features of the hydroelectric project. Part B, Detailed Financial Formats, covers O&M expenses (employee, R&M and A&G), admitted capital cost, break-up of plant and equipment cost, financial package up to COD, additional capitalisation and its financing, fixed assets and depreciation, project-specific and foreign loans, weighted average loan rate, drawdown schedule for IDC and financing charges, allocation of corporate loans, capitalised expenses, grants and subsidies, share capital and reserves, working capital, and capital expenditure and capital works in progress. Part C lists other information and documents to be filed, including incorporation and commencement certificates, audited balance sheets and profit and loss accounts, loan agreements, capital cost approvals, equity participation agreements, BPSA/PPA copies, and a note on time and cost overruns (p2).

It only reproduces the index. The order sets filing templates and documentary requirements, not tariff values or norms.

Standard name
Generation Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Generation tariff, Tariff determination

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document