Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
1 document matches “T-GNA corridor allocation”.
Sikkim Electricity Grid Code Regulations, 2025
- 7.9. Procedure for Scheduling and Despatch Timelines for …… Allocation of corridors by RLDC for GNA grantees as per IEGC. i. RLDC will check if drawal schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
- 7.9. Procedure for Scheduling and Despatch Timelines for …Provided that incase of constraint in transmission system, the available transmission corridor shall be allocated to the T-GNA grantees in proportion to their T-GNA.
3 matching passages in this document