Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Intra-state ABT and DSM Regulations, 2016 — Corrigendum, 2017

Corrigendum – Intra-state ABT and DSM Regulations, 2016

CorrigendumDated 2 Jun 2017Published in the Gazette 7 Nov 2016No. 78/CSERC/2016 dated 2nd June, 2017

Corrects the Intra-state Availability Based Tariff and Deviation Settlement Mechanism Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page corrigendum issued by the Chhattisgarh State Electricity Regulatory Commission on 2 June 2017 (p2), correcting the text of the CSERC (Intra-state Availability Based Tariff and Deviation Settlement Mechanism) Regulations, 2016, which were notified on 7 November 2016 (p2). It does not restate or replace the regulations; it rewrites specific phrases and cross-references so the parent instrument reads as intended.

The eight numbered corrections (p2–3) fall into three kinds. Several replace wording: clause 6.1(iv) and (v) now say "applicable rate (sum of Fixed Charges and Energy Charges, if any)" instead of "applicable rate"; clause 6.1(v) refers to "RE plants" rather than "wind and solar plants"; clause 11.8(d) reads "Buyers/Sellers" instead of "Buyers"; and clause 8.11 requires the deviation to be posted on the website by the concerned licensee within a week of its occurrence (p2–3). Others fix broken cross-references — clause 6.4 now points to clause (d) of Schedule A, clause 8.4 points to Clauses 8.2 and 8.3 instead of 9.1 and 9.2, and Schedule A's paragraph "(e)" is to be read as "(c)" (p2–3). Clause 8.1 gains new qualifying text tying application of the state grid provisions to the terms of prevailing power purchase agreements (p2).

Only the corrections are operative; the underlying obligations and the 2016 control framework are unchanged.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document