CSERC · Chhattisgarh State Electricity Regulatory Commission
Intra-state Availability Based Tariff and Deviation Settlement Mechanism Regulations, 2016
Chhattisgarh State Electricity Regulatory Commission (Intrastat€ Availability Based Tariff andDeviation Settlement Mechanism) Regrilations, zotii
RegulationDated 7 Nov 2016No' 74lcSERCl20l6 dated 7th November 2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
The CSERC (Intra-state Availability Based Tariff and Deviation Settlement Mechanism) Regulations, 2016 create a state-level ABT and deviation-settlement framework for Chhattisgarh. The Commission issues them on 7 November 2016 (p1), and they apply within Chhattisgarh to inter/intra-state entities, coming into force from the first day of the month after Gazette publication; the Gazette date is not printed (p2). Chapter I defines core terms such as deviation, absolute error for solar/wind, available capacity, MSC/SSC, SDSMA, State Grid User and time block (pp2–4). Chapter II builds the ABT tariff from capacity, energy and deviation-settlement components, and ties capacity/energy charges to the CSERC MYT Tariff Regulations, 2015 (p5). Regulation 5 sets who is covered: CSPGCL stations except Hasdeo Bango, conventional and RE generators above 5 MW contracting with state discoms, short-term suppliers, outside-state sellers, discoms, consumers/captive users and open-access consumers—often only for the deviation-charge component (pp5–6). Regulation 6 adopts CERC DSM 2014 basic rates and gives special deviation tables for renewable under-/over-injection, unscheduled power and caps (pp6–7). Regulation 7 fixes volume limits and additional charges on specified frequency bands, with exemptions for start-up/testing and solar/wind (pp7–9). Regulation 8 lays out scheduling and despatch, curtailment and revision rules (pp9–10); Regulation 9 covers gaming (pp10–11); Regulation 10 covers energy accounting for SSC/MSC and small solar/wind (pp11–12). Regulation 11 establishes the State DSM Account, billing cycle, meter-data flow, payment, interest and LC security (pp12–14). Regulations 12–14 give the Commission powers to relax, save/review and remove difficulties (p14). Schedule A contains the frequency-linked basic deviation rates (pp15–16); Annexures I and II give computation methodologies for under-injection/over-drawal and over-injection/under-drawal (pp17–18).
Read with this
Amendments and corrections
- Dated 2 Jun 2017Intra-state ABT and DSM Regulations, 2016 — Corrigendum, 2017
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.