Transmission Tariff Regulations, 2023 — Draft

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2023

Draft regulationDated 2 Dec 2023No. HPERC-F(1)-68/2023 dated 2 nd day of December, 2023

Draft

A proposal that has since been finalised as the Transmission Tariff Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a December 2, 2023 notification from the Himachal Pradesh Electricity Regulatory Commission (HPERC) publishing draft HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2023 for objections and suggestions (p1). It proposes to replace the 2011 transmission tariff regulations and to govern determination of aggregate revenue requirement (ARR) and transmission tariff for existing and future transmission licensees in Himachal Pradesh for the five-year control period from April 1, 2024 to March 31, 2029 (p2, p48). The draft regulations would come into force from the date of Gazette notification; the Gazette date is not printed (p2).

Part I (pp2–12) gives the title, commencement, statewide scope and definitions, including the applicability of the 2011 regulations to matters up to March 31, 2024. It also requires intra-state transmission projects above the Rs. 45 Crore threshold to be developed through tariff-based competitive bidding, with prior Commission approval for cost-plus exceptions (pp2–3).

Part II (pp12–23) sets the multi-year tariff framework: business plan, baseline determination, segregation of accounts, trajectories for availability, losses and transformer failure, MYT petition contents, annual accounts, tariff determination, mid-term performance review, in-principle approval for change-in-law/force majeure capex, true-up, carrying cost, normative annual transmission availability, controllable and uncontrollable factors, and sharing of gains or losses.

Part III (pp23–40) provides the ARR building blocks: capital cost and prudence check, IDC/IEDC, initial spares, additional capitalisation, renovation and modernisation, debt-equity ratio, O&M expenses, return on equity, tax, interest on loan and working capital, depreciation, non-tariff income, income from other business, late payment surcharge, payment security and safety standards.

Part IV (pp40–42) covers transmission tariff and charges: recovery of annual fixed charges, availability-linked monthly charge formula, reactive energy charges, open access, transmission losses and compliance with SLDC directions.

Part V (pp42–45) lays out filing procedure: business plan, tariff filing, mid-term and end-of-control-period review, disposal of applications and publication. Part VI (pp46–48) contains miscellaneous provisions on CDM benefit sharing, ceiling tariff and lower-tariff deviation, foreign exchange hedging, transitory provisions, orders and practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiry and repeal/savings. Appendices (pp49–55) provide depreciation rates, availability computation procedure, SIL values and a placeholder for availability formulae.

Standard name
Transmission Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗