Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Transmission Tariff Regulations, 2023

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2023

RegulationDated 14 Mar 2024In force from 1 Apr 2024No. HPERC-F(1)-68/2023 dated 14th day of March, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 28 of 54. Check the regulator's original before you rely on it.

The notification, dated 14 March 2024, makes the HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2023 under the Electricity Act, 2003. They come into force on 1 April 2024 and apply to all existing and future transmission licensees in Himachal Pradesh where the Commission determines capital-cost-based transmission tariffs. The control period runs from 1 April 2024 to 31 March 2029 unless reviewed or extended (p1). The regulations supersede the 2011 transmission tariff regulations, but review matters for periods up to 31 March 2024 continue under the 2011 rules (p1). Intra-state transmission projects above Rs 75 crore are to be developed through tariff-based competitive bidding under State guidelines, with prior Commission approval needed for cost-plus development (p2).

Part I (p1–12) sets commencement, scope and definitions, including control period, ARR, COD, cut-off date, availability, TSA, prudence check, useful life and MCLR-linked rates. Part II (p12–22) is the guiding framework: it requires a multi-year tariff approach, business plan, capital investment plan and DPRs, with filing deadlines and Commission approval of the investment plan (p12–16). It covers the MYT petition, annual accounts, tariff determination including consolidated petitions and interim tariff, mid-term performance review by 30 November 2026, true-up rules and carrying cost (p16–20). It also specifies operational norms for transmission availability and incentives (p20), classifies controllable and uncontrollable factors, and gives the gain/loss sharing mechanism (p20–22).

Part III (p22–28) begins the ARR principles: capital cost and exclusions, prudence check, IDC/IEDC treatment, initial spares, additional capitalisation within and beyond original scope and after cut-off, and the start of renovation and modernisation provisions (p22–28).

Standard name
Multi Year Tariff Regulations, Transmission Tariff Regulations
Primary topics
Transmission tariff, Multi Year Tariff (MYT), Tariff determination

Read with this

Commencement notices and reasons

Earlier drafts

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document