Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources Regulations, 2025

Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2025

RegulationDated 8 Aug 2025Published in the Gazette 12 Aug 2025Notification No. 07 of 2025 dated 08/08/2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The GERC (Procurement of Energy from Renewable Sources) Regulations, 2025 are Gujarat's new renewable procurement obligation regime, notified in the Gujarat Government Gazette of 12 August 2025 as Notification No. 07 of 2025 (p1). They come into force on Gazette publication, extend to the whole State, and replace the Commission's 2005 and 2010 renewable procurement regulations (p1, p11).

Regulation 3 defines who is obligated: distribution licensees, open access consumers and captive users in Gujarat, including anyone installing a conventional captive plant above 100 kW, with retail consumers of a distribution licensee carved out and designated consumers brought in regardless of captive plant size (p3). Regulation 4 fixes the annual obligation as a percentage of consumption, split into categories that must be met separately — wind, hydro, distributed renewable energy, other renewable energy and a total — alongside a parallel energy-storage obligation that counts towards the total; it also sets a two-way adjustment mechanism between wind and hydro, and between those and other renewable energy, and the rules for computing consumption (p4-6). The trajectory runs to FY 2029-30, with the last year's provisions continuing if nothing is notified for later (p5).

Regulation 5 sets out the routes to compliance — own generation, purchase, free/royalty power, banking and certificates — with anti-double-counting provisos covering rooftop solar and green hydrogen, and Regulation 6 ties the regime to the central REC regulations of 2010 and 2022, including restrictions on generator accreditation (p6-8). Regulation 7 designates the Gujarat Energy Development Agency as State Agency and requires it to build and operate an RPPO web-portal and report compliance; Regulation 8 makes online registration and periodic returns mandatory; Regulation 9 routes larger entities into a compliance petition before the Commission and smaller ones through the State Agency (p8-9). Regulation 10 sets the penalty regime — twice the TOE value of the shortfall under the Energy Conservation Act, paid into a ring-fenced fund, plus a s.142 Electricity Act penalty for non-reporting — and Regulations 11 to 17 deal with REC-mechanism purchase, overriding effect over the Commission's other regulations, directions, inherent powers, repeal with savings, and final interpretation (p9-11). Appendix-I carries the reporting formats (pp12-31).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation, Renewable energy certificates (REC)

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document