Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources Regulations, 2025 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2025.

Statement of reasonsDated 8 Aug 2025

The commission's reasons for the Procurement of Energy from Renewable Sources Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 55 of 117. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) for the Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2025. It explains why GERC is replacing its 2010 renewable procurement framework and records how it dealt with stakeholder objections (p1–4). The Commission says the new regulations are needed to align with CERC's 2022 REC regulations, the Ministry of Power's RPO trajectory notified on 22.07.2022 and MoP Notification No. 4617(E) dated 20.10.2023 (p2–3). It also notes the draft was published on 25.09.2024, comments were invited up to 18.10.2024, and a public hearing was held on 25.10.2024 (p3).

The bulk of the supplied pages is a clause-by-clause consultation record. For Regulation 2 (Definitions) (pp4–19), the Commission rules on definitions: it separates 'Act' to mean the Electricity Act, 2003 and refers to the Energy Conservation Act separately; it aligns 'Obligated Entity' with the GERC Green Energy Open Access Regulations, 2024; it aligns 'Green Energy' with MoP's Green Energy Open Access Rules, 2022; it accepts new definitions for 'person', 'power/energy exchange', 'captive generating plant' and 'open access'; and it clarifies REC mechanism linkage to CERC REC Regulations, 2022, while retaining the distributed renewable energy 3.5 kWh/kW/day multiplier as per MoP notification (pp10–18).

For Regulation 3 (Applicability) (pp19–30), it discusses who must meet the Renewable Power Purchase Obligation (RPPO): distribution licensees, open access consumers and captive users, with a 100 kW threshold for conventional captive plants. The Commission rejects a 5 MW threshold and clarifies that designated consumers under the Energy Conservation Act cannot use the captive-plant exemptions and must comply irrespective of capacity (pp23–30). For Regulation 4 (Quantum) (pp30–55), it addresses the RPO trajectory, category-wise wind/hydro/distributed/other obligations, energy storage obligation, fungibility between categories, computation of consumption including T&D losses and banking, and compliance through RECs. The Commission retains the MoP-aligned trajectory for 2024-25 to 2029-30, permits limited inter-category adjustment, and states that shortfalls may attract penalties under the Energy Conservation Act (pp46–55). The pages end while discussing Regulation 5 compliance methods (pp50, 54–55).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Energy storage obligation

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document