Summary
Summary written by software. Check the regulator's original before you rely on it.
This is DERC's explanatory note accompanying its 2007 Multi Year Tariff regulations for generation, transmission and distribution in Delhi, covering a Control Period running from the issue of the Regulations to 31 March 2011 (p4). It is a reasoning document addressed to licensees, generating companies and stakeholders, not an operative instrument, and it does not reproduce the Regulations themselves.
Pages 1–4 set out the background: privatisation of Delhi's distribution business from 1 July 2002, the "Policy Direction Period" 2002–2007 under GoNCTD policy directions of 22 November 2001 as amended on 31 May 2002, the arrival of the Electricity Act 2003, the National Electricity Policy and National Tariff Policy, and the Commission's decision to move to a comprehensive MYT regime. The stated objectives are regulatory certainty, tariff stability, efficiency incentives, equitable risk sharing and promotion of open access (p4). Pages 3–4 describe the consultation process: draft Regulations and a MYT Consultative Paper published on the website and in newspapers on 11.10.2006, copies sent to named stakeholders on 12.10.2006, and a public hearing on 27.11.2006.
Pages 4–8 explain the framework: the Control Period; segregation of costs into controllable and uncontrollable parameters; business plan and ARR filing requirements; review of capital investment with true-up only at the end of the Control Period; treatment of O&M as controllable; return on capital employed for transmission and distribution licensees against return on equity for generators; and CERC-aligned depreciation with advance against depreciation. They then cover generation tariff (norms of operation for existing and new stations, and a fuel price adjustment formula applied monthly), transmission tariff (an availability incentive), and distribution tariff (separation of wheeling from retail supply business to support open access, sales treated as uncontrollable, per-licensee AT&C loss targets with an incentive-sharing framework, a contingency reserve, annual truing-up of uncontrollable items, and profit sharing). Appendix 1 (pp9–11) lists the stakeholders who filed written submissions or attended the public hearing.
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.