DERC · Delhi Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff Regulations, 2017
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017
RegulationDated 31 Jan 2017In force from 1 Feb 2017No. F.3(472)/Tariff-Engg./DERC/2016-17/5475/2216 dated 31st January, 2017
2 amendments to it are on Voltaic, the latest dated 30 Apr 2026.
Summary
Summary written by software, from pages 1 to 41 of 249. Check the regulator's original before you rely on it.
This is the Delhi Electricity Regulatory Commission’s principal tariff regulation, notified on 31 January 2017 and deemed in force from 1 February 2017 for the whole of NCT Delhi (p2). It creates the framework the Commission uses to determine tariff for generating stations or units, transmission systems, and distribution systems used for wheeling and retail supply, while carving out projects whose tariff is discovered through Section 63 competitive bidding and renewable generating stations covered by other DERC instruments (p2–3). It applies to Utilities — generating entities, transmission licensees, distribution licensees, system operators and other regulated licensees — and permits ceiling tariffs where two or more distribution licensees compete in the same area (p3).
Part 1 (p2–16) sets commencement, extent, application and exclusions, then defines the regulation’s working vocabulary: ARR, allocation statement, additional capitalisation, Business Plan Regulations, Control Period, cut-off date, COD, declared capacity, de-capitalisation, existing/new project, prudence check, Utility and Beneficiary, among others.
Part 2 (p17–22) requires the Commission to notify Business Plan Regulations for each Control Period, to be read as part of these Regulations. Those regulations must contain parameters such as return on equity, interest margin, O&M expenses, capital investment plan, incentive/disincentive sharing, generating norms, transmission norms and distribution norms including loss, collection efficiency, RPO targets and ARR segregation (p17–18). Utilities must submit a five-year Business Plan by 31 July of the Base Year, with detailed operational, financial, capital investment, fuel, sales forecast, loss trajectory and power procurement data, and must submit audited historical data and source/indexation parameters (p18–22).
Part 3 (p23–26) prescribes annual tariff petition contents. Generating entities and transmission licensees file at least 150 days before the financial year-end; distribution licensees must include sales forecasts, revenue billed and realised, power procurement quantum and cost, transmission losses and charges, cross-subsidy and additional surcharge, energy audit report, monthly energy balance, capitalisation and depreciation schedules, non-tariff income and interest data, supported by auditor-certified financial statements and allocation reports (p23–26).
Part 4 (p27–28) sets the procedure: filing, fees under the Conduct of Business Regulations, presentation and executive summary, website publication, stakeholder objections, prudence check, tariff order and suo motu proceedings if the utility does not file.
Part 5 (p29–41) begins the ARR components. The portion covers capital cost for new and existing projects, IDC, IEDC, deposit schemes, additional capitalisation, de-capitalisation, renovation and modernisation, infirm power, capitalisation of administrative expenses, foreign exchange hedging and variation recovery, capital-cost variation true-up, and debt-equity structure (p29–41).
Read with this
Amendments and corrections
- Dated 10 Mar 2017Terms and Conditions for Determination of Tariff Regulations, 2017 — Corrigendum
- Dated 29 Mar 2023Terms and Conditions for Determination of Tariff Regulations, 2017 — First Amendment, 2023
- Dated 30 Apr 2026Terms and Conditions for Determination of Tariff Regulations, 2017 — Second Amendment, 2026
Commencement notices and reasons
Procedures and orders made under it
- Dated 10 Jun 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for April 2026
- Dated 10 Jul 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery order, 2026
- Dated 10 Aug 2026Relaxation under Regulation 172 of the Tariff Regulations, 2017 — FPPAS recovery for June 2026
- Dated 10 Nov 2026Relaxation under Regulation 172 of the Terms and Conditions for Determination of Tariff Regulations, 2017 — FPPAS recovery for September 2026
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 27 Dec 2016Terms and Conditions for Determination of Tariff Regulations, 2016 — Draft
- Dated 27 Dec 2016Annexure or form: Formats for ARR & Tariff Filing by Power Utility — Appendix-2, Terms and Conditions for Determination of Tariff Regulations, 2016
- Dated 27 Dec 2016Public notice: Draft Terms and Conditions for determination of Tariff Regulations, 2016 — Public Notice
- Dated 25 Jun 2021Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2021 — Draft
- Dated 13 Jan 2023Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.