TSERC · Telangana State Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive Systems Regulation, 2025 — Draft
Telangana Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025
Draft regulationDated 14 Aug 2025
Draft
A proposal that has since been finalised as the Rooftop Solar PV Grid Interactive Systems Regulation, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana Electricity Regulatory Commission issued this draft regulation on 14.08.2025 from Hyderabad (p24) to replace its 2016 rooftop-solar net-metering regulation. The preamble records that Regulation No. 6 of 2016 was published in the Telangana Gazette on 23.11.2016 and amended on 02.01.2021 by Regulation No. 01 of 2021, and that requests from stakeholders and licensees prompted a fresh regulation; the Commission states it will consider suggestions and may add or amend provisions before finalising (p1). It is made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003, extends to the whole of Telangana and comes into force on Gazette publication (p1).
Clauses 1–3 give the title, extent, commencement, a long definition list and the scope: distribution licensees (including deemed/exempted licensees), eligible consumers and third-party owners, across four arrangements — net metering, group net metering, gross metering and virtual net metering (p1–5).
Clause 4 sets the general conditions: non-discriminatory, distribution-transformer-wise first-come-first-serve allocation; per-arrangement capacity ceilings and minimum plant sizes; maximum rooftop capacity as a share of sanctioned load by consumer category; bars on consumers with arrears, on combining arrangements, on open access and on third-party sale; exemptions from banking, wheeling, cross-subsidy and additional surcharge that differ by arrangement; a twenty-five-year facility period; electrical-inspector certification above 75 kW; and 11 kV/33 kV connection rules (p5–8). Clause 5 caps aggregate rooftop capacity on a distribution transformer and on 11 kV/33 kV feeders, and requires licensees to publish and quarterly update available capacity (p8). Clause 6 lays out the application, registration and approval procedure, statutory timelines, deemed approval, feasibility validity, deficiency cost recovery and the connection agreement (p8–10). Clause 7 prescribes interconnection, grid standards and safety — CEA and grid-code conformity, protection and anti-islanding functions, earthing, harmonic limits, disconnection rights and isolator requirements (p10–13).
Clause 8 is the operational core: accounting and settlement rules for each arrangement — meter reading, bill contents, set-off of export against import, time-of-day netting for HT consumers, carry-forward and settlement of surplus at the lowest solar bidding tariff or TGDiscoms' PPA/PSA/PUA rate of the preceding financial year, preservation of minimum charges, treatment of disconnected connections and grievance redressal (p13–21). Clauses 9–11 cover RPO eligibility of rooftop generation, metering (CEA-conformant, AMI-ready meters, and who pays for the solar generation meter) and compensation for missed timelines (p21–22).
Clauses 12–20 deal with subsidy and incentive flow through the State Nodal Agency, inspection and vendor blacklisting, sharing of CDM benefits, restrictions under section 23 of the Act, accounting during meter defects, the connection agreement, the Commission's power to issue orders and practice directions and to remove difficulties, and amendment or review after three years (p22–24). Annexures 1–8 supply the capacity-disclosure format, application forms for each arrangement, participating-consumer undertakings and worked settlement illustrations (p25–45).
Read with this
The regulation
- Dated 15 Nov 2025Rooftop Solar PV Grid Interactive Systems Regulation, 2025
Procedures and orders made under it
Earlier drafts
- Dated 14 Aug 2025Public notice: Rooftop Solar PV Grid Interactive Systems Regulation, 2025 — Public Notice — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.