Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive Systems Regulation, 2025

Telangana Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025

RegulationDated 15 Nov 2025Published in the Gazette 15 Nov 2025TGERC/Secy/D.No:828/2025 dated 15.11.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 48. Check the regulator's original before you rely on it.

The Telangana Electricity Regulatory Commission issued this regulation on 15 November 2025 as Regulation No. 1 of 2025, published in the Telangana Gazette the same day; it extends to the whole State and comes into force on Gazette publication (p1–2). It replaces the 2016 rooftop-solar net-metering regulation and its 2021 amendment, and is made under the Electricity Act 2003 (pp1–2).

Pages 2–6 define the actors and arrangements: eligible consumer, prosumer, third-party owner, distribution licensee, and the four commercial arrangements — net metering, group net metering, gross metering and virtual net metering. It also defines parent and participating consumers/connections, solar generation meter, obligated entity, settlement period and renewable energy system (pp2–6).

Section 3 makes the regulation apply to distribution licensees, eligible consumers and third-party owners, and to all four arrangements (p6). Section 4 lays down general conditions: non-discriminatory first-come-first-served permitting, category eligibility, capacity ceilings and minimum sizes by arrangement, maximum rooftop capacity as a share of sanctioned/contracted load, whether arrangements can be combined, open-access interaction, and which banking/wheeling/cross-subsidy/additional-surcharge waivers apply to each arrangement (pp7–10). Section 5 caps cumulative rooftop capacity at distribution-transformer and 11 kV/33 kV feeder level and requires licensees to publish and update available capacity (pp10–11).

Section 6 sets the application, registration, feasibility, approval, agreement and commissioning procedure, including processing fees, timelines, deemed approval, cost estimates for network upgrades and cancellation for non-payment (pp11–13). Section 7 sets interconnection and grid-safety requirements: CEA and State Grid Code compliance, earthing, isolation, anti-islanding and protection functions, disconnection rights and responsibility for accidents (pp13–16).

Section 8 is the settlement core. It prescribes billing information and netting rules for each arrangement, time-block/TOD treatment for HT consumers, settlement of excess export at a price linked to the lowest solar PPA/PSA/PUA tariff under Section 63, minimum-charge preservation, annual changes to GNM/VNM sharing, and dispute routing to the consumer grievance mechanism (pp16–23). Section 9 treats rooftop solar generation as RPO compliance for the distribution licensee/obligated entity and gives a conversion multiplier where generation data is unavailable (pp23–24). Section 10 covers meter standards, AMI, who installs and pays for solar generation meters, testing and sealing (pp24–25).

Sections 11–18 cover compensation for missed timelines, central/state incentives and subsidy claims, inspection and blacklisting of non-conforming equipment, CDM benefit sharing, restriction-and-control measures, meter-defect accounting, the rooftop connection agreement, and the Commission’s power to issue orders and practice directions (pp25–26). Annexures 2–8 are referenced for application forms, undertakings, GNM/VNM illustrations and connection agreements.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Metering

Read with this

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document