Grid Support Charges for Captive Generating Plants Regulations, 2026

OERC (Grid Support Charges for Captive Generating Plants) Regulations, 2026

RegulationDated 7 Oct 2026Published in the Gazette 20 Nov 2026No. 1610---OERC.-11011(13)/1/2026-ENG-DIV-OERC dated The 7th October 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Odisha Electricity Regulatory Commission issues a principal regulation, notified on 7 October 2026 and published in the Odisha Gazette on 20 November 2026, to levy Grid Support Charges on co-located captive generating plants that run in parallel with the intra-State grid (p1). It extends to Odisha and comes into force on Gazette publication (p1).

Chapter 2 defines the operative concepts: Base MVA as the minimum dependable grid support capacity at the PCC, Grid Support Charges as a fixed monthly payment to the Transmission Licensee for grid support services, and co-located CGP, parallel operation and PCC (p1–2). Chapter 3 applies the regulations to co-located CGPs connected at 33 kV and above, including plants whose captive status is reviewed year to year under Rule 3 of the Electricity Rules 2005; renewable-energy CGPs are exempt only to the extent and manner the Commission orders (p3). The objective is to compensate the Transmission Licensee for grid support and provide a transparent, uniform framework (p3).

Regulation 4 sets the Base MVA Support Method. GSC equals Base MVA times a per-MVA monthly rate; Base MVA is installed capacity less contract demand less long-term scheduled export, floored at zero. The rate is derived from the Transmission Licensee's ARR, Odisha's installed generation capacity and fault levels at the PCC, with one parameter open to prospective modification by Commission order (p3–4). SLDC is nodal agency for the CGP list, data collection and system studies, with annual and monthly information deadlines; the Transmission Licensee computes GSC and passes it to Distribution Licensees for billing (p4–5). A special first-year timeline applies for 2026-27, and GSC revenue is non-tariff income under the tariff regulations (p5).

Regulation 5 assigns billing to the Distribution Licensee for CGPs that are its consumers and to the Transmission Licensee for others, requires a separate bill line, allows the Distribution Licensee to retain 1% of collections, and sets remittance and late-payment rules (p5–6). Regulation 6 treats CGP non-payment as ordinary electricity/transmission dues and provides for late payment surcharge and recovery under the OERC Distribution (Conditions of Supply) Code, 2019 (p6). Regulations 7–11 provide powers to remove difficulties, relax, amend, interpret finally and preserve the Commission's inherent powers (p6–7).

Primary topics
Late payment surcharge and rebate, Captive status, Operating costs and other income

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document