Grid Support Charges for Captive Generating Plants Regulations, 2026 — Statement of Reasons
ODISHA ELECTRICITY REGULATORY COMMISSION (GRID SUPPORT CHARGES FOR CAPTIVE GENERATING PLANTS) REGULATIONS, 2026
Statement of reasonsDated 7 Oct 2026
The commission's reasons for the Grid Support Charges for Captive Generating Plants Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Commission's Statement of Reasons for the OERC (Grid Support Charges for Captive Generating Plants) Regulations, 2026, dated 7 October 2026 (p1). It is not the regulation text; it explains why the Commission is creating a charge on co-located captive generating plants that run in parallel with OPTCL's intra-State transmission system, and how it dealt with stakeholders.
Part 1 traces the litigation. A 2020 OPTCL application seeking Grid Support Charges was registered as Case No. 52 of 2020; the Orissa High Court set those proceedings aside on 6 July 2023 but gave liberty to examine justifiability and, if justified, frame a regulation under Section 181 of the Electricity Act, 2003 (p1). The Commission closed the old case and later, in Case No. 44 of 2024, directed OPTCL to produce a consolidated study covering inertia, harmonics and reactive power at the PCC and generator terminals (p1–2).
Part 2 sets out the technical case. OPTCL's study describes the benefits CGPs get from parallel operation — fault-current reduction, better PLF, voltage/frequency support, capital savings — and the burdens they impose through harmonics, unbalanced current and load variation (p2–3). The Commission limits the levy to co-located CGPs, excludes IPPs, non-co-located captive users and open-access consumers, who remain under transmission/wheeling/scheduling rules, and exempts renewable-energy-based CGPs "at this stage" while reserving review (p3–4). It adopts the Base MVA Support Method, using installed capacity, Contract Demand, scheduled long-term export and PCC fault-level parameters (p4–5). It cites the Supreme Court's Rain Calcining judgment but says the 2026 Regulations stand independently under the 2003 Act (p5).
Part 3 records publication of the draft on 22 January 2026, newspaper notice on 23 January, and comments originally due 23 February, extended to 25 March; 17 stakeholders responded (p5–6, p17). Part 4, the bulk, answers issue-wise: statutory competence; why only co-located CGPs; recognition of reciprocal fault support; rejection of bespoke site-by-site assessment; the renewable-energy exemption; a cost base tied to a share of approved ARR excluding miscellaneous receipts; treatment as Non-Tariff Income; billing through distribution licensees where the CGP is their consumer, otherwise by the transmission licensee; a normative collection charge; and late payment surcharge for delayed remittance (p6–15).
Part 5 finds the framework justified, and Part 6 says the Regulations are finalised (p15–16). Annexure-I lists the 17 commenting stakeholders (p17).
Read with this
The regulation
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.