Connectivity, LTA and MTOA Detailed Procedure, 2009 — Amendment, 2015 (online submission of applications)

Amendment to the Detailed Procedure issued under Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access and Medium Term Open Access) Regulations, 2009 as amended from time to time

ProcedureDated 5 Jun 2015

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC letter of 5 June 2015 conveying the Commission's approval of amendments to the Detailed Procedure framed under the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access) Regulations, 2009, so that applications can be filed online. Online submission becomes operational from 1 July 2015, and CTU (POWERGRID) was asked to give the revised procedure wide publicity (p1).

The Annexure (pp2–9) rewrites the application-related paragraphs of three procedures. Para 3 (pp2–4) makes online filing through CTU's open-access portal the only route for connectivity applications, lists the signed printout, notarised affidavit, fee proof and generating-station supporting documents to be attached, and fixes the addressee. All online applications in a month are treated as concurrent; the signed copy and documents must reach CTU in the first week of the following month, with express rules for scheduled and unscheduled holidays. Late or incomplete applications are either carried into the second month or rejected, with the fee forfeited and any bank guarantee returned (p4).

Paras 11, 13.2 and 15 (pp4–6) do the same for medium-term open access: affidavit and online form, electronic fee payment to POWERGRID, a document list including SLDC concurrence, PPA and trading licence, and the same month-cycle, holiday and rejection rules.

Para 23 (pp6–9) covers long-term access: online filing, connectivity details, advance intra-state concurrence, and an application bank guarantee per MW of power to be transmitted with validity, discharge and encashment triggers, plus the same deadline and rejection regime.

Standard name
Open Access Regulations, Connectivity and GNA Regulations
Primary topics
Open access, Connectivity and GNA

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.