CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

RegulationDated 7 Jun 2022No. L-1/261/2021/CERC dated 7.6.2022

4 amendments to it are on Voltaic, the latest dated 11 Nov 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 50. Check the regulator's original before you rely on it.

This is the CERC regulation that creates a single framework for Connectivity and General Network Access (GNA) to the inter-State transmission system. Issued on 7 June 2022 under the Electricity Act, 2003, it says it consolidates the regulations on the subject (p1). Its commencement is deferred: it comes into force on a date CERC may notify, and different regulations may start on different dates (p1).

Chapter 1 (regs 1–2, p1–5) defines the main vocabulary: GNA, T-GNA, Connectivity, ATS, ESS, Lead Generator/Lead ESS, REGS/RHGS, NOAR and the Nodal Agency. The Nodal Agency is CTU for connectivity/GNA, RLDC for bilateral T-GNA, NLDC for collective T-GNA and NLDC for NOAR (p4).

Chapter 2 (reg 3, p5–6) sets the front-end application process: online applications to the Nodal Agency, fees, deficiency cure, closure and refund/forfeiture. Chapter 3 (regs 4–16, p6–17) is the Connectivity code. It specifies who can apply and at what minimum size or through a Lead Generator/Lead ESS, what an application must contain, how CTU does interconnection studies and identifies the Associated Transmission System (ATS), in-principle and final grants, and the connectivity bank guarantee structure (Conn-BG1/2/3) with encashment/return rules. It also covers the Connectivity Agreement, monitoring, dedicated transmission lines and terminal bays, infirm power/start-up power, interface meters, transfer/split of connectivity and treatment of bank guarantees (p6–17).

Chapter 4 (regs 17–25, p17–25) creates GNA. It lists eligible GNA applicants, provides deemed GNA for existing users based on a historical drawal formula for 2018-19 to 2020-21 and on legacy Long Term Access/Medium Term Open Access, and sets out applications for additional GNA by STU and other entities, system studies, grants, effective dates, use of GNA by other grantees, and relinquishment of Connectivity or GNA with charges and encashment (p17–25).

Chapter 6 (regs 26–33+, p25–32) deals with Temporary GNA. It lists who may buy/sell through T-GNA, makes NOAR the single-window platform, and sets application categories for bilateral and collective transactions, processing timelines, priority of GNA over T-GNA, Standing Clearance from SLDCs (including deemed grant), grant/rejection, revision and scheduling requests (p25–32).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document