Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Generation Tariff Regulations, 2020 (Revision-IV) — First Amendment, 2023

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) (Revision-IV) Regulations, 2020 {ARG-26 (IV) (i) OF 2023} (First Amendment).

AmendmentDated 23 Jan 2023No. 215/MPERC/2023 dated 23rd January 2023

Replaced by Generation Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The First Amendment to MPERC's Generation Tariff Regulations, 2020 (Revision-IV) was issued at Bhopal on 23 January 2023 under s.181(2)(zd) read with s.61 of the Electricity Act 2003 (p4). It extends to the whole of Madhya Pradesh and comes into force from the date of publication in the official Gazette — that Gazette date is not printed in this text; the only Gazette date given is 28 February 2020, when the Principal Regulations were published (p4, p6).

The operative content is short. Regulation 2.1, on scope and extent of application, is substituted wholesale (p4–5). The replacement confines the regulations to tariff determination under s.62 read with s.86 for generating stations and units other than renewable-energy stations supplying a distribution licensee, and carves out stations whose tariff was discovered through competitive bidding and adopted under s.63. The new 2.2 lists the categories where the Commission will still determine tariff under s.62: state-government-owned identified developers; expansion of existing stations tied to long-term PPAs, with a one-time capacity-addition cap for private developers and conditions on reuse of common infrastructure and technology benefits; a share of the installed capacity of projects under any State Government policy tied to the state distribution licensee; hydro and pumped-storage developers who opt in subject to Tariff Policy 2016 conditions; hydro sites of more than 100 MW design capacity awarded before the Tariff Policy 2016 date; and coal-washery-reject stations of state PSUs or qualifying joint ventures (p5–6). New 2.3 routes new stations with PPAs executed after 05.01.2011 into transparent bidding with s.63 adoption, with a proviso covering older PPAs where financial closure had not been achieved by 31.03.2019 (p6).

Regulations 5.4 and 5.6 of the Principal Regulations are then deleted outright (p6); this text does not say what they covered.

Standard name
Generation Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Competitive bidding

Read with this

The regulation itself is not yet published on Voltaic.

No other documents to read with it are on Voltaic.

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 main regulation.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗