Generation Tariff Regulations, 2024

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2024 {RG-26 (V) of 2024}

RegulationDated 27 Jun 2024Published in the Gazette 27 Jun 2024In force from 1 Apr 2024MPERC/2024/1552- dated 27 June, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software, from pages 1 to 34 of 100. Check the regulator's original before you rely on it.

The Madhya Pradesh Electricity Regulatory Commission has issued a principal generation tariff regulation for a five-year control period. The Gazette notification is dated 27 June 2024 (p1), but the Regulations commence from 01.04.2024 and remain in force to 31.03.2029 unless reviewed or extended (p1). They are made under s.181(2)(zd) read with s.61 of the Electricity Act, 2003 (p1).

Chapter 1 (pp1–13) sets the title, extent and commencement, then scope. It applies to Section 62 tariff determination for generating stations other than renewable sources, supplying a distribution licensee, but not to projects whose tariff is discovered through competitive bidding under Section 63 (p2). It lists categories remaining under Section 62 cost-plus tariff: state-owned identified developers; expansion of existing stations within limits; up to 35% of capacity under a state policy; hydro/PSP projects opting for Section 62 for long-term PPAs; certain pre-2016 hydro sites above 100 MW; coal-washery-reject stations by state PSUs/JVs subject to a shareholding cap; and residual stations (pp2–4). It then defines more than 60 terms, including AUXe for emission-control systems, change in law, cut-off date, useful life and reference rate of interest (pp4–13).

Chapter 2 (pp14–23) is the procedure. Generating companies file for provisional and final tariff for new stations, MYT for existing stations, and supplementary tariff for emission-control systems, with deadlines and carrying-cost consequences (pp14–16). The Commission may grant interim tariff up to 90% of annual fixed cost and controls true-up recovery/refund with interest (pp17–21). It also covers in-principle approval for large additional capitalisation, annual accounts, periodicity, overcharging penalties and annual review (pp20–23).

Chapter 3 (pp24–25) sets the tariff structure: two-part capacity and energy charges for thermal stations, supplementary charges for emission-control systems, hydro tariffs as per Regulation 48, annual fixed cost components, energy-charge components, and special provisions after 25 years of thermal operation.

Chapter 4 (pp26–33) computes capital cost for new, existing, hydro and NCLT/IBC-acquired projects, exclusions, prudence check, IDC/IEDC, controllable/uncontrollable factors and initial spares. Chapter 5 (p34) begins additional capitalisation within original scope up to cut-off date.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Other copies of these documents (1)

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.