Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Arunachal Pradesh Electricity Supply Code, 2024

Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2024

CodeDated 6 Mar 2024Published in the Gazette 11 Mar 2024No. APSERC/NOTIFICATION/38/2024 dated The 6th March, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software, from pages 1 to 18 of 86. Check the regulator's original before you rely on it.

The APSERC (Electricity Supply Code) Regulation, 2024 is a re-issued principal regulation that sets the whole working relationship between distribution licensees and electricity consumers in Arunachal Pradesh. It was notified on 6 March 2024 and printed in the Arunachal Pradesh Gazette of 11 March 2024 (p1). It comes into force from the date of notification in the official gazette and, on the same date, repeals the Commission's Electricity Supply Code Regulation, 2020 (p1). It applies to all distribution and retail supply licensees (including deemed licensees) and all consumers in the State, to persons exempted under s.13 of the Act, and to unauthorised supply, unauthorised use and diversion of electricity (p1). Licensees may adjust the annexed forms and formats, keeping the prescribed minimum information, with the Commission's prior approval (p1).

The Code is organised in eight Sections (p1, contents at pp2–4). Section 1 (pp5–9) defines and interprets the vocabulary used throughout — load, demand, metering, licensee, prosumer, franchisee, rural versus remote areas and so on. Section 2 (pp10–14) fixes the technical terms of supply: declared frequency and permitted band, supply voltage classes, the load/contract-demand bands that determine the voltage at which supply is given, voltage-variation limits, EV charging outlet rules, dedicated feeders for power-intensive units, low-voltage surcharge and high-voltage rebate, power factor duties, safety and wiring compliance with CEA regulations, transformer and motor protection, harmonic limits, agriculture pump-set requirements, parallel operation with the grid, distribution through franchisees, and a cross-reference to the separate Standards of Performance Regulations.

Section 3 (pp14–31 as listed) is the procedural core: the licensee's obligation to supply and to extend its system, how the cost is shared between licensee and consumer, works a consumer may execute himself, conditions for grant of connection and mandatory public display of procedures and charges, treatment of special categories (separate premises, multi-consumer and multi-storeyed complexes, high-rise buildings), and the full new-connection workflow — application forms, registration-cum-processing fee, documents, portal-based processing and tracking, release timelines by area type, and single-point supply to group housing with sub-consumers (pp14–18). Sections 4 to 8, seen only through the contents list, deal with recovery of charges and the cost data book, metering/billing/payment (including net metering, disputed bills and late payment surcharge), theft and unauthorised use of electricity including assessment and appeal, disconnection and reconnection, and general provisions covering load shedding, service of notice, demand-side management, repeal and savings, and relaxation powers (pp2–4). Annexures 10.1–10.13 hold the application forms, security-deposit norms, supervision charges and miscellaneous charge schedules (pp14–18).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Earlier drafts

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document