APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Electricity Supply Code Regulation, 2024 — Draft
Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2024
Notice extending the date for comments on a draftDated 16 Feb 2024APSERC/NOTIFICATION/______
Draft
The draft has since been finalised as the Arunachal Pradesh Electricity Supply Code, 2024.
Notice extending the date for comments on a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft notification from the Arunachal Pradesh State Electricity Regulatory Commission (APSERC) that publishes the full text of the APSERC (Electricity Supply Code) Regulation, 2024, to replace the 2020 Supply Code (p1). It is made under the Electricity Act, 2003 and is intended to apply to all distribution and retail supply licensees, including deemed licensees, and all consumers in Arunachal Pradesh, as well as persons exempt under s.13 and cases of unauthorised supply or use of electricity (p1–2). The Code is stated to come into force on 1 April 2024 in the official Gazette of Arunachal Pradesh (p2). The draft notification itself has blank date and notification number fields (p1).
The Code is organised into eight sections and fourteen annexures. Section 1 supplies definitions and interpretation rules (p7–15). Section 2 governs the system of supply and consumer classification: voltage levels and supply categories, the licensee's voltage-maintenance duty, load balancing, power factor, safety of installations, dedicated feeders for power-intensive units, higher/lower voltage supply, EV charging outlets, parallel operation, franchisee distribution and standards of performance (p16–22).
Section 3 is the largest operational part: it sets out the licensee's obligation to supply, cost-sharing and extension of the distribution system, the procedure for new, temporary and modified connections, application forms and documents, inspection, demand notes, security deposits, agreements, name transfer, load enhancement/reduction and general conditions of supply (p23–56). Section 4 covers recovery of supply expenses, electricity charges, approval of the cost data book and miscellaneous charges (p57–60). Section 5 deals with metering, billing and payment: meter requirements including smart/prepaid meters, reading, testing and replacement, a cross-reference for net/gross metering of distributed renewable energy, billing and special billing situations, modes of payment, disputed bills, late payment and recovery of arrears (p61–81). Section 6 prescribes the procedure for theft and unauthorised use of electricity, including inspection, show-cause, hearing, assessment and appeal (p82–91). Section 7 covers disconnection and reconnection (p92–94). Section 8 contains general provisions on consumer access, load shedding, service of notice, demand-side management and ToD tariff, awareness, repeal and savings, and relaxation/removal of difficulties (p95–98).
The annexures provide the application and notice formats, connected-load and test-report formats, security-deposit norms, theft/UUE assessment formula, the Cost Data Book for lines/substations/service connections, the schedule of miscellaneous charges and service timelines (p99–140).
Read with this
The regulation
- Dated 6 Mar 2024Arunachal Pradesh Electricity Supply Code, 2024
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.